                                                                                   Environmental Management Plan

                                                                                      Peregian Beach Caravan Park




The Contractor will be responsible for the implementation of the EMP during the construction stages of the
development. The Contractor will also be the responsible party for implementing the EMP during the
mandatory maintenance period for the operational stage of development.

The Contractor (on behalf of Contrast Constructions Pty Ltd) is responsible for ensuring all personnel
including subcontractors are aware of the contents of the EMP and act accordingly. The Site Manager is the
site supervisor and supervises the Contractor.

All staff employed by the facility shall be educated, during the site induction, on the environmental obligations
of the EMP, informed of the significance of the EMP and their general environmental duty of care under the
Environmental Protection Act 1994. The EMP shall be made available to all staff employed at the facility as
a reference document. A summary of the roles and responsibilities during the construction and mandatory
maintenance period is provided in Table 2.1.

Once each stage of the development proceeds to `off-maintenance', implementation of the EMP will then fall
to the Body Corporate.

                                  Table 2.2: Summary of Roles & Responsibilities


TITLE             ROLE                                              RESPONSIBILITY

                      The Site Manager has overall responsibility       Authorising and ensuring the EMP is made
                      to ensure that the construction works occur       available to all staff and authorities.
                      as per requirements, while adhering to        •   Being wholly responsible for operation of
                      statutory requirements.                           the   site   including   compliance  and
                  •   The Site Manager has overall responsibility       implementation with the EMP.
                      to ensure implementation and operation of     n   Allocating resources for environmental
                      environmental practices on the site.              management, training and EMP duties.
                  n       Perform regular inspections of the site   •   Engagement of environmental auditor when
                      works to identify areas that require              necessary.
Site Manager          improvements.
                                                                    •   Reviewing     EMP      effectiveness     for
                  n   The Site Manager must regularly liaise with       continuous improvement.
                      the Construction Foreman and regulatory
                      authorities.                                  •   Reporting to relevant authorities including
                                                                        Council.
                                                                    n   Liaising with Council, agencies, neighbours,
                                                                        complainants, community groups and other
                                                                        stakeholders.
                                                                    n   Maintaining complaints register.

                  •   Direct all works for machinery and truck          Some reporting to relevant authorities
                      operators.                                        including Council and the Site Manager.
                  •   Prepare and collate all necessary reporting       Controlling EMP including revision & issues.
                      for the site e.g. incident reports, progress      Ensuring project operations are performed
                      reports, monitoring reports and submit            in accordance with requirements.
                      these to the Site Manager.
                                                                        Ensure all personnel on site have
                  •   Engagement and briefing of consultants and        undertaken site induction.
Construction          sub contractors.
                                                                        Reviewing inspection reports and following
Foreman               Undertake all site inductions.                    up on actions.
                  n   Arranging and attending inspections and .         Ensuring non-compliances are reported and
                      meetings.                                         corrective actions are taken.
                  n   Schedule periodic meetings with operational       Ensuring    subcontractors         fulfil   their
                      staff to discuss and record improvement           environmental obligations.
                      opportunities, keeping up to date with
                      industry guidelines.
                                                                        Reviewing environmental procedures.
                  n   Assigning project staff to perform EMP            Undertake daily monitoring and reporting




1101 14_PR20517-EMP.doc                                                                                        Page 7

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.