                                                                                            Environmental Management Plan
                                                                                               Peregian Beach Caravan Park



TITLE                 ROLE
                          duties.                                                requirements for Site Environmental Log,
                      n   Implementing the EMP for all environmental             including, rainfall records, pH & turbidity
                          matters on site, with authority to direct              values with on-site probe, etc.
                          compliance with the EMP.                               Establish and maintain the incident register,
                      n   Liaison with necessary consultants, auditors           complaints    register     and   compliance
                          and health and safety officers.                        checklists and report this information to the
                                                                                 Site Manager.
                      n   Perform regular inspections of the site
                          works to identify areas that require
                          improvements.

                      •   Undertake site works as instructed by the •            To undertake site works with a duty of care
                          Construction Foreman.                                  under the Environmental Protection Act
All Staff             •   All equipment used and works undertaken                1994.
(including                are in compliance with this EMP.
                      n    Report   all   incidents.     spills   or   non
Contract Staff)
                          conformances     with    the     EMP to the
                          Construction Foreman

                      n   Undertake scheduled and non scheduled •                Scheduled inspections and audits of all
                          environmental inspections and audits and               environmental protection measures and
                          reporting of compliance with the EMP.                  their efficiency.
                      n   Undertake regular monitoring events.           •       Unscheduled inspections of the site
Environmental             The Environmental Auditor / Officer will be            following       instances  of    increased
                          independent of the Principal Contractor.               environmental risk (eg. heavy rainfall) or
Officer / Auditor
                                                                                 reported non-compliance.
                      n   The Environmental Auditor/Officer will be
                          qualified and have specific skills required to         Review monitoring reports, corrective
                          cover the range of environmental issues                actions, incident register and complaints
                          covered in this EMP.                                   logs as required.

                      n   Develop and undertake all site works in            n   Implementing the Occupational Health &
                          accordance with the Occupational Health                Safety Plan.
Occupational              and Safety Plan.
Health & Safety       n   Undertake site OHS inductions.
Officer               •   Review and amend procedures relating to
                          chemicals and hazardous materials stored
                          and used on site where necessary.




                Training Requirem

The environmental management techniques outlined in this management plan apply to all persons working
on or entering the site. A copy of the EMP will be issued to all personnel working on or entering the site,
including contractors and subcontractors. A site induction will be conducted for all persons prior to entering
or working on the site. The induction will include:

          An introduction to the environmental values of the site;
          An explanation of the management techniques used on site to protect environmental values;
          An explanation of the requirements for all persons working on and entering the site; and
          An understanding of responsibilities under relevant legislation and ramifications to individuals if the
          EMP requirements are not followed.

Following this site induction each person will be required to sign a declaration stating that they have been
informed of the specific site environmental requirements and have understood these requirements. All
signed declaration forms shall be kept at the site office by the Site Manager. The signed declaration forms




1101 14_PR20517_EMP.doc                                                                                            Page 8

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.