Environmental Management Plan
Peregian Beach Caravan Park
• yl.• itn .i• k 01.. ..1 • ill[ • ..
Compliance with erosion and sediment controls;
- Performance of temporary control measures and maintenance performed;
Local weather conditions prior to monitoring;
Rainfall events and intensities;
Any corrective action taken to maintain performance requirements; and
Details of any changes required to the erosion and sediment control measures.
n Monthly audit report to be completed by Environmental Officer and should include any recommended corrective actions and document
any information provided by the Contractor.
• In the event of a non-conformance, the Site Manager is to report to the Environmental Officer. The Environmental Officer shall inspect
and record:
Nature of the non-conformance (e.g. failure of sediment fencing leading to high suspended solids);
Actions taken to prevent the non-conformance from recurring (i.e., fortification, realignment of fence or installation of upstream
cut off drain);
Provide photographic evidence of completed remedial actions; and
Provide laboratory analysis of sampling locations (inflow and outflow points) specified in Table 13 within the Stormwater
Management / Erosion and Sediment Control Plan (Appendix A).
n In the event of material or serious environmental harm, the Site Manager is to report to Council and appropriate regulatory authorities;
and
n Copies of reports to be retained and provided to Sunshine Coast Regional Council if requested.
Responsibility
• Construction Foreman;
• Site Manager: and
n Environmental Officer.
Corrective Action n Required corrective action will be undertaken by the Construction Foreman;
110114_PR20517_EMP.doc Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.