                                                                                                                                           Environmental Management Plan
                                                                                                                                              Peregian Beach Caravan Park



 •        yl.•           itn .i• k         01.. ..1    • ill[ • ..


                                     Compliance with erosion and sediment controls;
                               -     Performance of temporary control measures and maintenance performed;
                                     Local weather conditions prior to monitoring;
                                     Rainfall events and intensities;
                                     Any corrective action taken to maintain performance requirements; and
                                     Details of any changes required to the erosion and sediment control measures.
                         n   Monthly audit report to be completed by Environmental Officer and should include any recommended corrective actions and document
                             any information provided by the Contractor.
                         •   In the event of a non-conformance, the Site Manager is to report to the Environmental Officer. The Environmental Officer shall inspect
                             and record:
                                     Nature of the non-conformance (e.g. failure of sediment fencing leading to high suspended solids);

                                     Actions taken to prevent the non-conformance from recurring (i.e., fortification, realignment of fence or installation of upstream
                                     cut off drain);
                                     Provide photographic evidence of completed remedial actions; and
                                     Provide laboratory analysis of sampling locations (inflow and outflow points) specified in Table 13 within the Stormwater
                                     Management / Erosion and Sediment Control Plan (Appendix A).
                         n   In the event of material or serious environmental harm, the Site Manager is to report to Council and appropriate regulatory authorities;
                             and
                         n   Copies of reports to be retained and provided to Sunshine Coast Regional Council if requested.
                         Responsibility
                         •   Construction Foreman;
                         •   Site Manager: and
                         n   Environmental Officer.

Corrective Action        n   Required corrective action will be undertaken by the Construction Foreman;




110114_PR20517_EMP.doc                                                                                                                                 Page 16

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.