                                                                                                                                            Environmental Management Plan
                                                                                                                                                Peregian Beach Caravan Park




                             Sediment that has accumulated to 1/3 of the fence height is be removed;
                         n   In the event of material or serious environmental harm, consultation will be undertaken with Council and regulatory authorities for an
                             agreement to be reached in relation to appropriate corrective and preventative actions to be taken.
                         n   Any changes or improvements to the Stormwater Management Plan / Erosion and Sediment Control Plan resulting from audits and
                             reviews, will be made as soon as possible following the audits and reviews;
                         n   In the event of erosion and sediment control failure, proposed deviation from the Erosion and Sediment Control Plan or alteration to the
                             proposed construction sequence, the Construction Foreman is to seek written advice from the Environmental Officer. It is the
                             responsibility of the Construction Foreman to implement any amendments to the erosion and sediment control structures as
                             recommended by the Environmental Officer;
                         n   Corrective actions to be undertaken as per the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A)
                             including:
                         Upsiope storm water flow diversion
                         •   When loss of control of the upslope flow diversion occurs:
                                    Follow contingency plan as outlined for EP-SECP-01 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
                                    If necessary, remove sediment mobilised on road surfaces with a spade and broom. Do not use water;

                                    Repair perimeter bank: reinstall berm, secure the jute mat;

                                    Repair or replace geo-logs if damaged. Securely peg to the ground to ensure no flow under log;
                                    Add a second geo-log 1 to 4m upslope if necessary; and

                                    Improve the stability of ground surface that receives diverted water (refer to 'Maintaining groundcover).
                         Site entry and exit points
                         n   When sediment transportation from the site access point is occurring:
                                     Follow contingency plan as outlined for EP-SECP-02 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
                                     Remove sediment from road surface using a spade and broom. Do not use a hose;
                                     Building contractor to advise staff about responsibilities inherent with hosing off mud;
                                     Install extra length of rock pad or grid if necessary;



110114_PR20517_EMP.doc                                                                                                                                 Page 17

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.