Environmental Management Plan
Peregian Beach Caravan Park
Sediment that has accumulated to 1/3 of the fence height is be removed;
n In the event of material or serious environmental harm, consultation will be undertaken with Council and regulatory authorities for an
agreement to be reached in relation to appropriate corrective and preventative actions to be taken.
n Any changes or improvements to the Stormwater Management Plan / Erosion and Sediment Control Plan resulting from audits and
reviews, will be made as soon as possible following the audits and reviews;
n In the event of erosion and sediment control failure, proposed deviation from the Erosion and Sediment Control Plan or alteration to the
proposed construction sequence, the Construction Foreman is to seek written advice from the Environmental Officer. It is the
responsibility of the Construction Foreman to implement any amendments to the erosion and sediment control structures as
recommended by the Environmental Officer;
n Corrective actions to be undertaken as per the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A)
including:
Upsiope storm water flow diversion
• When loss of control of the upslope flow diversion occurs:
Follow contingency plan as outlined for EP-SECP-01 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
If necessary, remove sediment mobilised on road surfaces with a spade and broom. Do not use water;
Repair perimeter bank: reinstall berm, secure the jute mat;
Repair or replace geo-logs if damaged. Securely peg to the ground to ensure no flow under log;
Add a second geo-log 1 to 4m upslope if necessary; and
Improve the stability of ground surface that receives diverted water (refer to 'Maintaining groundcover).
Site entry and exit points
n When sediment transportation from the site access point is occurring:
Follow contingency plan as outlined for EP-SECP-02 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
Remove sediment from road surface using a spade and broom. Do not use a hose;
Building contractor to advise staff about responsibilities inherent with hosing off mud;
Install extra length of rock pad or grid if necessary;
110114_PR20517_EMP.doc Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.