                                                                                                                                              Environmental Management Plan
                                                                                                                                                 Peregian Beach Caravan Park



CONSTRUCTION PHASE - EROSION & SEDIMENT CONTROL

                                    Improve delivery of high pressure water hose if possible; and
                                    Avoid work under muddy conditions.
                         Designated on-site stockpiles
                         •   When loss of materials from stockpiles is occurring:
                                    Follow contingency plan as outlined for EP-SECP-03 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
                                    Repair the geo-log, perimeter stockpile covers and sediment fence, if required:
                                    Address upslope controls if required (refer to'Upslope stormwater flow diversion); and
                                    Contractor to reinforce the need to cover stockpiles.
                         Downslope sediment controls
                         n   When significant loss of sediment down-slope is occurring:
                                    Follow contingency plan as outlined for EP-SECP-04 in the Stormwater Management Plan / Sediment and Erosion Control Plan;

                                    Improve groundcover if rills are evident;
                                    Repair sediment fences;
                                    Remove sediment from sediment fences and stockpile (refer to 'Designated on-site stockpiles) for later use as topsoil; and
                                    Install temporary downpipes promptly.
                         Maintaining groundcover
                         n   When water is flowing over unstable ground:
                               -    Follow contingency plan as outlined for EP-SECP-05 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
                                    Building contractor to reinforce the need for managing off site movement of disturbed soil because of the high environmental
                                    values associated with Noosa National Park;
                               -    Ensure that erosion mats are intact and properly installed: and
                                    Ensure that re-seeding and irrigation is occurring. Install additional erosion mats, grass cover, or turf if necessary.




110114_PR20517_EMP.doc                                                                                                                                        Page 18

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.