                                                                                                                                               Environmental Management Plan
                                                                                                                                                  Peregian Beach Caravan Park




CONSTRUCTION PHASE - SURFACE & GROUND WATER QUALITY

This element to be read in conjunction with the Stormwater Management Plan & Sediment/ Erosion Control Plan (Simmonds & Bristow, 2010) (Appendix A) and the Erosion
and Sediment Control Element (Section 3.1).

Performance Criteria                          n   Performance requirements for water discharge(s) during construction of the site include (in accordance with the
                                                  construction phase objectives in the Noosa River: Environmental Values and Water Quality Objectives 2007 and
                                                  Queensland Water Quality Guidelines 2009):
                                                         Total suspended solids <50 mg/L and/or 80% reduction in suspended solids compared to untreated stormwater
                                                         runoff from the developed part of the site;
                                                         60% reduction in Total Phosphorus compared to untreated stormwater runoff from the developed part of the site;

                                                         45% reduction in Total Nitrogen compared to untreated stormwater runoff from the developed part of the site;
                                                         pH 6.5 - 8.5; and
                                                         Turbidity: Discharge <50NTU and/or released waters from approved discharge point/s have turbidity less than 10%
                                                         above that of receiving waters (measured immediately upstream of the site).
                                              n   No exposure of acid sulfate soils (ASS) to the external environment;
                                              n   Correct management of acid sulfate soils if exposure occurs;
                                              •   No discharge of contaminated water to receiving waters;
                                              n   No deterioration in water quality in adjacent surface waters; and
                                              •   No deterioration in groundwater quality.
Implementation Strategies                     n   Implement all erosion and sediment temporary control measures (as outlined in the Soil Erosion and Sediment Control
                                                  element of this EMP; Section 3.1, and the Stormwater Management Plan / Sediment and Erosion Control Plan Appendix
                                                  A) prior to the commencement of bulk earthworks;
                                              n   Implement all Hazardous Substances and Waste Management implementation strategies (as outlined in the EMP;
                                                  Section 3.3 & Section 3.10);
                                              n   All contractors are to be trained during site inductions on the identification of Potential Acid Sulfate Soils (PASS) and ASS.
                                                  Common indicators of PASS or ASS include:



110114_PR20517-EMP.doc                                                                                                                                     Page 19

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.