Environmental Management Plan
Peregian Beach Caravan Park
CONSTRUCTION PHASE - SURFACE & GROUND WATER QUALITY
Presence of dark grey sands or clays (e.g. mangrove mud);
Presence of very clean water or clean bluish water;
Soils which exhibit sulphurous odour; and
Presence of iron (red coloured) stains in water or on soil.
n Any excavation works consisting of 100m3 or greater which extends below 5m AHD will need to be carried out in
accordance with State Planning Policy 2102 Planning and Managing Development Involving Acid Sulfate Soils. Appropriate
testing and supporting documentation prepared by a suitably qualified specialist shall be submitted to Council for approval
prior to obtaining a Development Permit for Operational Works;
n Should exposure of acid sulfate soils occur, the following steps should be implemented:
Stop excavation in the area; and
Advice should be sought from an appropriate qualified professional on specific treatment methods (e.g. liming of the
affected material).
n All stockpiles to be located in accordance with Stormwater Management Plan / Sediment and Erosion Control Plan
Appendix A;
n Where chemical treatment is required, chemicals will be kept away from sensitive areas and the selected chemical should
be frog friendly such as BioactiveTM Herbicide, Roundup or Weedmaster Herbicide. Broad scale spraying is not permitted;
n Permanent control measures are to be installed as soon as possible after completion in each construction area. Permanent
measures (e.g. vegetated buffers, bio-retention trenches, constructed wetland system) are to be installed as outlined in the
Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A).
Monitoring A daily site checklist will be used by the Construction Foreman to ensure that contractors understand and perform the
required management actions. The checklist to be utilised is included as Appendix C of the Stormwater Management Plan /
Sediment and Erosion Control Plan (Appendix A);
n Daily visual inspections of excavation works for PASS & ASS;
Monthly audit and review of implemented temporary control devices and site erosion and sediment control procedures by
the Environmental Officer;
Monthly water quality monitoring during the construction phase to be conducted by the Environmental Officer, as per the
monitoring schedule, methodology and locations outlined in Stormwater Management Plan / Sediment and Erosion Control
Plan; (Appendix A). The following water quality parameters are to be monitored:
1101 14_PR20517_EMP.doc Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.