Skip to the record
Accept no substitutions.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                        Environmental Management Plan
                                                                                                                                          Peregian Beach Caravan Park



CONSTRUCTION PHASE - SURFACE & GROUND WATER QUALITY

                                             pH;
                                             Dissolved oxygen;
                                             BOD5
                                             Suspended Solids;
                                             Total Nitrogen;
                                             Total Phosphorus;
                                             Herbicides;
                                             Faecal coliforms;
                                             Enterococci; and
                                             Turbidity.
                                 •    Measure suspended solids of stormwater flowing into and out of the building site during stormwater events;
                                 •    A rain gauge is to be installed on site to monitor rainfall intensity during stormwater events;
                                 n    Herbicide monitoring in stormwater entering and leaving construction site should be performed when applications are
                                      known to occur; and
                                 n    Refer to the monitoring in Section 3.1 (Soil Erosion and Sediment Control Element in EMP).
Reporting / Responsibility       Reporting
                                 n Daily inspection checklist to be completed by Construction Foreman;
                                  n   Monthly reporting by the Construction Foreman to Site Manager addressing the monitoring results during construction,
                                      including:
                                             Compliance with erosion and sediment controls;
                                             Local weather conditions prior to monitoring;
                                             Outcomes from monitoring conducted throughout stormwater events:
                                             Any corrective action taken to maintain performance requirements;
                                              Details of any changes required to the erosion and sediment control measures;
                                              Incidences of untreated stormwater release;
                                              Records of leachate staining or environmental harm in receiving waters; and
                                              Records of any general water quality deterioration of water quality in adjacent waterways.
                                  •   Copies will be provided to Sunshine Coast Regional Council if requested.



1101 14_PR20517_EMP.doc                                                                                                                          Page 21

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.