                                                                                                                                  Environmental Management Plan
                                                                                                                                     Peregian Beach Caravan Park



CONSTRUCTION PHASE - SURFACE & GROUND WATER QUALITY

                                      Monthly audit to be completed by Environmental Officer, and should include any recommended corrective action and
                                      document any information provided by the contractor;
                                  n   Monthly water quality monitoring to be completed by Environmental Officer.
                                  n   In the event of non-conformance, the Site Manager is to report to the Environmental Officer. The Environmental Officer
                                      shall inspect and record:
                                              Nature of the non-conformance:
                                              Actions taken to prevent the non-conformance from recurring;
                                              Provide photographic evidence of completed remedial actions; and
                                              Provide laboratory analysis of sampling locations.
                                  •   In the event of material, or serious environmental harm, the Site Manager is to report to Council and appropriate regulatory
                                      authorities.
                                 Responsibility
                                  •   Construction Foreman;
                                  •   Site Manager; and
                                  •   Environmental Officer.

Corrective Action                 n   Corrective action will be undertaken by the Construction Foreman;
                                  •   In the event of serious environmental harm, consultation will be undertaken with Council and regulatory authorities for an
                                      agreement to be reached in relation to appropriate corrective and preventative actions to be taken;
                                  •   In the event of exposure of release of PASS or ASS, consultation will be undertaken with an appropriately qualified
                                      professional and agreement reached in relation to appropriate corrective and preventative actions to be taken;
                                  •   Corrective actions outlined in the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A)
                                      including those outlined in Section 3.1 of this EMP.




1101 14_PR20517_EMP.doc                                                                                                                      Page 22

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.