Environmental Management Plan
Peregian Beach Caravan Park
n Fuelling, maintenance and washing of plant and equipment shall be conducted where practicable within a bunded area on
site with facilities for the storage, removal or disposal of wastewater;
Spills and disposal
n All contractors are to be trained during site inductions on spill and clean up procedures;
n Clean-up equipment, absorbent materials, and any materials for neutralising or decontaminating spills on the premises will
be kept in a safe accessible location on site and contractors will be adequately trained In the use of these materials;
n Clean-up of spills or leaks will occur immediately. Contaminated materials will not to be reused and will be appropriately
contained and packaged for transport for either recycling or disposal by a licensed waste removal contractor;
n Spill clean up kits shall be kept in relevant locations throughout the site;
• In the event of a spill, immediate actions shall be taken to contain the spill to prevent contamination. The Construction
Foreman shall be informed as soon as practicable; and
• The use of sawdust or other readily combustible absorbents to clean up flammable liquid spills will be avoided. A suitable
clean up kit shall be kept on site and personnel trained in the use of such equipment. Records of training shall be kept
within the personnel file of each employee.
Other
• Only minor servicing of vehicles shall take place (e.g. replace burst hydraulic hoses). All other servicing shall be
undertaken off site:
n Any areas where petroleum products and/or other potentially hazardous substances were stored should be
decommissioned and where necessary remediated at the completion of construction works;
• Material Safety Data Sheets (MSDS's) for all hazardous substances used or stored on site will be kept in a register; and
n Paint washdown facilities with provision of effluent collection shall be established.
Monitoring • Weekly visual inspections of construction works, storage areas, plant and equipment by the Construction Foreman to
ensure appropriate hazardous substances management performance;
n Containment of contaminated water within the bunding is to be monitored by the Construction Foreman during significant
rainfall event; and
n Monthly audit and review of storage locations and procedures by the Environmental Officer.
Reporting! Responsibility Reporting
n Chemical inventory and storage locations to be maintained by the Construction Foreman;
1101 14_PR20517_EMP.doc Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.