                                                                                                                                             Environmental Management Plan
        o
                                                                                                                                                Peregian Beach Caravan Park



DESIGN I CONSTRUCTION PHASE - AIR QUALITY

                               from closest weather station):
                           •   Recording of all incidents, air quality complaints received and details of all control measures undertaken in the Incidents and Complaints
                               Register (Section 2.5):
                           n   Construction Foreman to report all complaints to the Site Manager who is to then inform Contrast Constructions Pty Ltd:
                           n   All complaints received by Contrast Constructions Pty Ltd from the public or advised by Sunshine Coast Regional Council shall be forwarded
                               to the Site Manager and Construction Foreman to be entered on the Incidents and Complaints Register for the project together with adopted
                               remedial measures;
                           •   Reporting of any air quality monitoring to be undertaken by a suitably qualified consultant. A copy of the report shall be provided to Council
                               upon request:
                           n   Monthly reports completed by the Construction Foreman of complaints received, including details of any monitoring activities, control
                               measures and corrective actions subsequently undertaken. This report will be available upon request from responsible regulatory authorities;
                           n   Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and document any
                               information provided by the Construction Foreman.
                           Responsible Person
                               Site Manager.
                               The Construction Foreman.
                               Suitably qualified air quality consultant.
                               Environmental Officer.
Corrective Action              If air quality complaints are received from adjacent residents, Contrast Constructions Pty Ltd will investigate those complaints and determine
                               whether further air quality monitoring is required;
                               If results from air quality monitoring indicate compliance with the standards mentioned in the Implementation Strategies section, releases
                               from the site are not considered a nuisance and no further action will be required;
                               Conversely, if results exceed the standards in the Implementation Strategies section, offensive sources must cease and corrective measures
                               taken until compliance can be achieved; and
                               If necessary, air quality control measures shall be reviewed in consultation with a qualified air quality consultant and upgraded if appropriate
                               to the satisfaction of the Site Manager and Sunshine Coast Regional Council.




1 101 14_PR20517_EMP.doc                                                                                                                                 Page 41

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.