Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
Peregian Beach Caravan Park
Performance Criteria Comply with the:
Environmental Protection Act 1994;
Schedule 1 of the Environmental Protection (Noise) Policy 2008; and
Sunshine Coast Regional Council (SCRC) by-laws.
n No receipt of legitimate complaints.
Implementation Strategies • Control all noise generating mobile and stationary plant and equipment in accordance with AS2436: 1981 Guide to Noise
Control on Construction, Maintenance and Demolition Sites;
n Control measures may include but are not limited to the following:
The fitting of effective residential grade exhaust silencers to all mobile plant;
The fitting of engine acoustic shielding;
Using exhaust silencers on compressed air exhausts;
The use of physical noise barriers such as earth mounds or mobile screens;
Review of times of operation of plant;
Vehicle speed limits; and
The use of specific pavement materials (which can reduce noise) for the construction of roads.
• All vehicles shall be operated and maintained in a manner which ensures that noise levels produced by the vehicles are
within the limits of the Commonwealth Department of Infrastructure, Transport, Regional Development and Local
Government Australian Design Rule ADR28 - External Noise of Motor Vehicles;
• All plant and machinery used during construction shall be maintained in a sound mechanical condition;
• Engines shall not be left idling needlessly; and
n Unless SCRC and the DERM permits otherwise, site working hours shall be as follows:
Monday - Saturday 6.30 am to 6:30 pm
Sunday and public holidays No work permitted
• Activities that may generate significant noise or vibration shall be scheduled between the hours of 8.30 am - 5.00pm on
weekdays (Mon - Fri) and between the hours of 8.30 am -1.00pm on Saturdays.
Monitoring n Daily site inspections by the Construction Foreman of the:
Types;
1101 14_PR20517_EMP.doc Page 42
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.