Environmental Management Plan
e r J
Peregian Beach Caravan Park
DESIGN / CONSTRUCTION PHASE - NOISE & VIBRATION
Locations; and
Details of control measures in place.
• Weekly inspections by the Construction Foreman of all noise generating sources (including inspection of new items before
they commence work on the site) to record details and compliance of sound control measures.
• If requested by Council in response to a complaint of nuisance, noise monitoring shall be undertaken by a suitably
qualified consultant; and
• Monthly audit and review of control measures implemented on site by the Environmental Officer.
Reporting / Responsibility Reporting
• Recording of all incidents, noise complaints received and details of all control measures undertaken in the Incidents and
Complaints Register (Section 2.5);
• Construction Foreman to report all complaints to the Site Manager who is to then inform Contrast Constructions Pty Ltd;
n All complaints received by Contrast Constructions Pty Ltd from the public or advised by Sunshine Coast Regional Council
shall be forwarded to the Site Manager and Construction Foreman to be entered on the Incidents and Complaints Register
for the project together with adopted remedial measures;
n Reporting of any noise monitoring to be undertaken by a suitably qualified consultant. A copy of the report shall be provided
to Council upon request;
• Monthly reports completed by the Construction Foreman of complaints received, including details of any monitoring
activities, control measures and corrective actions subsequently undertaken. This report will be available upon request from
responsible regulatory authorities;
n Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
document any information provided by the Construction Foreman.
Responsible Person
• Site Manager.
• The Construction Foreman.
• Suitably qualified air quality consultant.
• Environmental Officer.
n Investigate all activities producing excessive noise.
Corrective Action
n Where necessary, remedial action shall be undertaken by the Construction Foreman to the satisfaction the Site Manager
1101 14_PR20517_EMP.doc Page 43
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.