Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                         Environmental Management Plan
   701-914
   LLMAIL-A                                                                                                                 Peregian Beach Caravan Park




                              and Sunshine Coast Regional Council.
                          •   Possible remedial action may include:
                                       The activity responsible for the offending noise may be either re-scheduled for a more appropriate time,
                                       operational practices modified or noise emissions attenuated via the use of temporary noise barriers.
                                       In the case of machinery, the machinery may be inspected to identify any necessary repairs, which may have
                                       contributed to an excessive noise release.
                                       Development of further mitigation measures to achieve compliance.
                                       Inspection by a qualified acoustic consultant
                          n   In the event of a noise complaint:
                                       Liaise with the complainant in an attempt to resolve the complaint e.g. reschedule/ replace noise offensive source
                                       and implement remedial actions; and
                                       If complaint cannot be resolved; monitor and identify mitigation measures in consultation with a suitably qualified
                                       noise consultant (e.g. sound barriers) and Council.




1101 14_PR205I7_EMP.doc                                                                                                              Page 44

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.