Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
701-914
LLMAIL-A Peregian Beach Caravan Park
and Sunshine Coast Regional Council.
• Possible remedial action may include:
The activity responsible for the offending noise may be either re-scheduled for a more appropriate time,
operational practices modified or noise emissions attenuated via the use of temporary noise barriers.
In the case of machinery, the machinery may be inspected to identify any necessary repairs, which may have
contributed to an excessive noise release.
Development of further mitigation measures to achieve compliance.
Inspection by a qualified acoustic consultant
n In the event of a noise complaint:
Liaise with the complainant in an attempt to resolve the complaint e.g. reschedule/ replace noise offensive source
and implement remedial actions; and
If complaint cannot be resolved; monitor and identify mitigation measures in consultation with a suitably qualified
noise consultant (e.g. sound barriers) and Council.
1101 14_PR205I7_EMP.doc Page 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.