Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
Peregian Beach Caravan Park
OPERATIONAL PHASE - SURFACE & GROUND WATER QUALITY
Maintaining 3m3 rainwater tank volume associated with each beach shack
• When loss of control of the rainwater tank and roof guttering system occurs:
Follow contingency plan as outlined for EP-SMP-01:
Empty and clean, repair or replace the rainwater tank if required;
Maintaining underground rainwater tanks associated with the ornamental garden Irrigation scheme
• When loss of control of the underground rainwater storage tank occurs:
Follow contingency plan as outlined for EP-SMP-02; and
Empty and clean, repair or replace the rainwater tank if required.
1 101 I4-PR20517_EMP.doc Page 53
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.