Environmental Management Plan
Peregian Beach Caravan Park
Performance Criteria • Efficient use of water by the proposed development;
n Performance criteria recommended in the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A), including:
Maintaining 3m3 rainwater tank volume associated with each beach shack
Costs of maintaining the rainwater capture system are kept to a minimum;
Water quality parameters should conform to the ANZECC 2000 guidelines for primary contact, as outlined in the Surface and Ground
Water Quality Element. Section 4.1;
Maintaining underground rainwater tanks associated with the ornamental garden Irrigation scheme
Costs of maintaining the rainwater capture system are kept to a minimum;
Water quality parameters should conform to the ANZECC 2000 guidelines for secondary contact, as outlined in the Surface and
Ground Water Quality Element, Section 4.1; and
Irrigating the ornamental gardens
- Routine delivery of harvested rainwater onto the gardens.
Implementation Strategies • The irrigation system design shall utilise drip irrigation systems or other water efficient techniques;
• All new kitchen, laundry and bathroom fittings shall comply with the AAA Water Conservation Ratings System as defined by the AS/NZS
6400 (Water Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), or
current equivalent standards as may apply, with toilets to comply with the AAA Water Conservation Rating System. All new tapware and
shower roses shall not exceed a maximum flow of 9 Umin. Dishwashers and washing machines are excluded from this requirement (as
outlined in DA Condition 27);
• Implementation strategies recommended in the Stormwater Management Plan I Sediment and Erosion Control Plan (Appendix A), including:
Maintaining 3m3 rainwater tank volume associated with each beach shack
Carry out routine checks on structural integrity of rainwater tanks;
Carry out routine checks on water quality (as outlined in Section 4.1).
Maintaining underground rainwater tanks associated with the ornamental garden irrigation scheme
Carry out routine checks on structural integrity of rainwater tanks;
Carry out routine checks on water quality (as outlined in Section 4.1): and
Irrigating the ornamental gardens
- Install an irrigation system with programmable logic that reliably delivers harvested rainwater onto the grounds:
1101 14_PR20517_EMP.doc Page 54
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.