Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
Peregian Beach Caravan Park
• Empty and clean, repair or replace the rainwater tank if required (as outlined in Section 4.1);
Maintaining underground rainwater tanks associated with the ornamental garden irrigation scheme
• Clean contributing catchment area of oil spills, litter, sediment accumulation if required;
n Clean screen of accumulated detritus if required;
n Empty and clean, repair or replace the rainwater tank if required (as outlined in Section 4.1); and
Irrigating the ornamental gardens
• Repair and/or reprogram the programmable logic controller; and
• Repair the structure of the pipework as required.
1101 14_PR20S 17_EMP.doc Page 56
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.