Environmental Management Plan
B 0 r
Peregian Beach Caravan Park
OPERATIONAL PHASE - VEGETATION PROTECTION
This element to be read in conjunction with the Ecological Restoration Plan (RPS, 2010) (Appendix B). Relevant information has been extracted from these documents for
inclusion in this element of the EMP. This element is also related to the Weed Control, Bushfire Management and Fauna Elements, which also should be read / considered
when implementing this Element.
Performance Criteria Rehabilitation completed in accordance with the Ecological Restoration Plan (Appendix B) and the Landscape Plan to be
prepared for the site;
No destruction of retained vegetation within the designated parkland area;
Performance criteria listed in the Ecological Restoration Plan (Appendix B) including:
Rehabilitation zones 1 and 2 revegetated;
No weed species in rehabilitation zones;
Fencing intact;
After the completion of 1 year of maintenance the following should be achieved:
Mulched cover maintained around planted species;
All mortalities replaced;
No to minimal weeds;
Wildling recruitment evident in rehabilitation zone 1; and
All planted species showing evidence of health and vigour (i.e. new growth) and appear well established.
n Carry out rehabilitation in accordance with the Ecological Restoration Plan (Appendix B) including:
Implementation Strategies
Revegetation in rehabilitation zones 1 and 2 is to commence as soon as the construction phase has been
completed;
Rehabilitation zone 1 (landscape, fire trail and stormwater area) is to be revegetated with prescribed species and
densities for RE12.2.7 (listed in Appendix A of the Ecological Restoration Plan; Appendix B of this EMP);
Planting with prescribed species and densities for RE12.2.12 & RE12.2.15 (listed in Appendix A of the Ecological
Restoration Plan; Appendix B of this EMP) is to occur within spot treatment areas in rehabilitation zone 2;
Revegetation works to be undertaken in accordance with the methods prescribed in the Ecological Restoration Plan;
Signage is to be erected to demarcate the rehabilitation zones;
n Suitable fencing (e.g. fauna-friendly fencing) will be established around rehabilitation areas to prevent degradation through
1101 14_PR20517_EMP.doc Page 57
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.