Appendix D_Engineering Report
Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.
The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 38, section 1. The text section number identifies this passage in the reader.
i. are durable enough to carry estimated continuous movement of cyclists along a
wheel loads of travelling and parked roadway, such as—
vehicles; a) sealed shoulders;
ii. provide for the safe passage of vehicles, b) wide kerbside lane;
pedestrians, cyclists, and c) exclusive or peak period bicycle
discharge of stormwater run-off from lane;
contributing catchments and the d) advisory treatments such as
preservation of all weather access; Bicycle Awareness Zone;
c) kerb and channel— e) shared parking / bicycle lane;
i. controls vehicle movement by delineating f) contra flow bicycle lane; and
the carriageway for all users; g) bus/bicycle lane.
ii. conveys road pavement run-off to
stormwater drainage in a manner that S22.4 The provision of bicycle lanes at S22.4 Not applicable.
allows the road to be trafficable in Q100 intersections is generally in accordance with
ARI local rainfall events; and AUSTROADS Part 14, section 5 and the Manual
d) verges and footpaths provide— of Urban Traffic Control Devices (MUTCD) Part 9.
i. safe access for pedestrians and cyclists clear
of obstructions;
ii. an access area for vehicles onto
properties;
iii. a corridor allocated for services and
utilities; and
iv. additional amenity for minor roads.
O23 S23.1 Stormwater drainage planning, design and RO23 Stormwater drainage will be designed and
Stormwater drainage infrastructure is planned, construction is in accordance with Section 4 of constructed in accordance with Section 4 and
designed and constructed to— PSP5 Engineering Design Standards – Roads, 6 of the PSP5 Engineering Design Standards
a) be accessible, cost effective and easily Drainage and Earthworks; and the QUDM.
maintainable; AND
b) protect downstream capacity; S23.2 As Constructed data is submitted in
c) protect downstream water quality; accordance with Section 6 of PSP5 Engineering
d) maximise on-site stormwater retention and Design Standards – Roads, Drainage and
retardation; and Earthworks;
e) convey run-off to stormwater drainage in a AND
manner that allows roads to be trafficable in Q100 ARI S23.3 Stormwater drainage planning, design and
local rainfall events. construction is in accordance with the
Queensland Urban Drainage Design Manual.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.