Appendix D_Engineering Report

Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 39, section 1. The text section number identifies this passage in the reader.

O24                                               S24.1     Roads and stormwater drainage RO24.1 The proposed internal driveway and
Roads and stormwater drainage infrastructure is infrastructure is constructed in accordance with—     stormwater drainage infrastructure will be
constructed—                                      a)     Sections 2, 3 and 4 of PSP5 Engineering      constructed in accordance with the
a)     in accordance with appropriate engineering Design Standards – Roads, Drainage and              applicable standards.
       standards; and                             Earthworks;
b)    to minimise adverse environmental impacts, b)      Queensland Design Code for Residential
      including from run-off and erosion.         Streets;
                                                  c)     AUSTROADS; or
                                                  d)     A combination of the principles in these
                                                  documents;
                                                  AND
                                                  S24.2 Erosion and sediment control measures RO24.2 An Erosion and Sediment Control Plan will
                                                  are designed and implemented in accordance         be prepared by Morgan Consulting
                                                  with the Institution of Engineers Australia        Engineers and will be implemented in
                                                  (Queensland Division) Soil Erosion and Sediment    accordance with the applicable standards.
                                                  Control - Guidelines for Queensland Construction
                                                  Sites.
Environmental Protection                               S25.1 Roads and stormwater drainage follow        RO25.1 Roads and stormwater drainage works will
O25                                                    the edge of existing disturbed areas, or                 be co-located within a combined utility
Roads and stormwater drainage infrastructure are alternatively, these works are co-located within               corridor.
located and aligned so as to—                          a combined utility corridor;
a)     minimise disturbance to native vegetation       AND
      and/or other habitat areas;                      S25.2 Roads avoid native vegetation and           RO25.2 Acknowledged.
b)     protect and maintain wildlife corridor          provide for fauna underpasses and associated
       movements and the safety of native fauna;       fencing where appropriate;
c)    minimise changes to the hydrological regime, AND
      including drainage patterns, run-off and water S25.3 Road infrastructure within or adjacent to     RO25.3 Acknowledged.
      quality;                                         native habitat incorporates fences which allow
d)     avoid crossing watercourses, drainage lines and for protected wildlife movement and controls
       wetlands, but where such crossings are unrestricted access of domestic cats and dogs;
       unavoidable, disturbed areas are reinstated and AND
       revegetated on completion of works; and         S25.4 Native vegetation is protected from         RO25.4 Acknowledged.
e)     minimise bulk earthworks.                       clearing or construction activities by—
                                                       a)       clearly marking vegetation to be
                                                       retained with flagging tap;
                                                       b)     installing protective fencing around the
                                                       dripline of vegetation; and
Log in to download the original file

Appendix D_Engineering Report.pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.