O24 S24.1 Roads and stormwater drainage RO24.1 The proposed internal driveway and
Roads and stormwater drainage infrastructure is infrastructure is constructed in accordance with— stormwater drainage infrastructure will be
constructed— a) Sections 2, 3 and 4 of PSP5 Engineering constructed in accordance with the
a) in accordance with appropriate engineering Design Standards – Roads, Drainage and applicable standards.
standards; and Earthworks;
b) to minimise adverse environmental impacts, b) Queensland Design Code for Residential
including from run-off and erosion. Streets;
c) AUSTROADS; or
d) A combination of the principles in these
documents;
AND
S24.2 Erosion and sediment control measures RO24.2 An Erosion and Sediment Control Plan will
are designed and implemented in accordance be prepared by Morgan Consulting
with the Institution of Engineers Australia Engineers and will be implemented in
(Queensland Division) Soil Erosion and Sediment accordance with the applicable standards.
Control - Guidelines for Queensland Construction
Sites.
Environmental Protection S25.1 Roads and stormwater drainage follow RO25.1 Roads and stormwater drainage works will
O25 the edge of existing disturbed areas, or be co-located within a combined utility
Roads and stormwater drainage infrastructure are alternatively, these works are co-located within corridor.
located and aligned so as to— a combined utility corridor;
a) minimise disturbance to native vegetation AND
and/or other habitat areas; S25.2 Roads avoid native vegetation and RO25.2 Acknowledged.
b) protect and maintain wildlife corridor provide for fauna underpasses and associated
movements and the safety of native fauna; fencing where appropriate;
c) minimise changes to the hydrological regime, AND
including drainage patterns, run-off and water S25.3 Road infrastructure within or adjacent to RO25.3 Acknowledged.
quality; native habitat incorporates fences which allow
d) avoid crossing watercourses, drainage lines and for protected wildlife movement and controls
wetlands, but where such crossings are unrestricted access of domestic cats and dogs;
unavoidable, disturbed areas are reinstated and AND
revegetated on completion of works; and S25.4 Native vegetation is protected from RO25.4 Acknowledged.
e) minimise bulk earthworks. clearing or construction activities by—
a) clearly marking vegetation to be
retained with flagging tap;
b) installing protective fencing around the
dripline of vegetation; and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.