Original source · versioned page text
Appendix D_Engineering Report
Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.
The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 40, section 1. The text section number identifies this passage in the reader.
c) ensuring stock piling, storage and vehicle
parking occur outside the areas of vegetation to
be retained;
AND
S25.5 Low impact construction techniques are RO25.3 Acknowledged.
used around areas of vegetation to be retained
to minimise interference with the vegetation.
O26 No solution provided RO26 Not applicable.
Roads and stormwater drainage infrastructure is
proven to be suitable for its use prior to Council
accepting the dedicated asset.
O27 S27.1 The location, design and construction of RO27 Acknowledged.
Alignment of stormwater drainage infrastructure is to stormwater drainage structures is in accordance
allow for easy access for the ongoing maintenance by with Sections 4 and 5 of PSP5, Engineering
Council. Design Standards - Roads, Drainage and
Earthworks;
AND
S27.2 Where infrastructure is located on private
land an easement is dedicated over the
infrastructure in accordance with Section 4 of
PSP 5, Engineering Design Standards – Roads,
Drainage and Earthworks.
O28 S28.1 The following infrastructure components RO28 The existing road frontage is complete with
Development is provided with external roadworks already exist at the frontage of the site or are kerb and channel and underground utilities.
along the full extent of the frontage of the site to an provided at the developer’s Any works within the road verge fronting the
appropriate standard having regard to the specified expense— site will be in line with Noosa Council
function of the road. a) full width sealed road; Standards.
b) concrete kerb and channel where appropriate;
c) forming and grading to footpaths;
d) vehicular kerb and footpath crossings;
e) a constructed bikeway;
f) a constructed footpath;
g) a constructed carriageway;
h) required alterations to public utility mains,
services or installations;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.