Maintenance Frequency Although HumeCeptor® will continue to operate
effectively until sediment completely fills the
It is generally recommended that inspection of the unit treatment chamber. It is still deemed good practice
to be undertaken every three months for the first year of that maintenance should be performed “annually” or
operation. This schedule may then be relaxed after a year, “once the sediment depth exceeds the guideline values”
when confidence is gained regarding the actual pollutant provided in Table 2, whichever condition is achieved first.
load and run-off generated by the up-stream catchment.
A more frequent program may be required where there is HumeCeptor® units are often installed in areas where
greater risk of oil spills. the potential for hydrocarbon spillage is great. However
HumeCeptor® should be cleaned immediately after any
You may elect to undertake inspection yourself or major spill occurs, by a licensed liquid waste contractor.
choose to contract a waste management company to You should also notify the appropriate regulatory
obtain a complete inspection and maintenance package. agencies as required in the event of a spill.
Contact the nearest Humes office for recommendations/
information regarding companies, which have the
capabilities to provide an inspection and maintenance
Removal of Hazardous Material
service in your area.
The requirements for the disposal of material removed
from the HumeCeptor® are similar to that of any other
The need for maintenance can be determined easily by
stormwater treatment device. Local guidelines should be
inspecting the unit from the surface. The depth of oil in
consulted prior to disposal.
the interceptor can be determined by inserting a dipstick
in the oil sample port. Similarly, the depth of sediment
The sediment, once de-watered, may be suitable for
can be measured from the surface without entry into
disposal in a sanitary landfill. It is recommended to check
the HumeCeptor® via a clear tube (Sediment sampler) -
with the relevant authorities in your local area as some
sediment sampler tubes are available from Humes. The
local authorities may require testing of the sediment
sampler is inserted in the 610 mm opening in the “disc”
prior to disposal.
in-line models and through the 100 mm oil sample port
in the “inlet” models.
All petroleum waste-products, collected in the
HumeCeptor® (oil/chemical/fuel spills), should
As a general rule an annual maintenance schedule is
be removed and disposed of by a licensed waste
recommended. However maintenance requirement
management contractor.
frequency will vary with the volumes of stormwater
pollution generated by your site (number of spills,
amount of sediment, etc.). So while annual maintenance
is recommended, the frequency of maintenance may be
varied (increased or reduced) based on local conditions;
if the unit is filling up with sediment more quickly than
projected, maintenance may be required semi-annually;
conversely once the site has stabilised maintenance may
only be required every two or three years.
7 HumeCeptor® system
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.