Minor Change - Planning Report 22.08.2028
Operational Works approval OPW21/0199 Change the following conditions to reflect the amendments to the development. 9. Proposed change to condition 48 Approved Plans The Landscaping Plans have been amended to reflect the required 0.5m garden along the western boundary of the driveway and as a result the listed amendment can be deleted and the detailed engineering plans included in the Table of approved plans. The applicant seeks the Condition to be amended to read: 48. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date L01-01_I I Landscape Notes & Schedules, prepared by 08-08-25 Blackburne Jackson L03-01_J J Landscape Planting Plan, prepared by 14-08-25 Blackburne Jackson L03-02_J J Landscape Planting Plan, prepared by 14-08-25 Blackburne Jackson L07-01_I I Landscape Details, prepared by Blackburne 08-08-25 Jackson L07-02_A A Landscape Details, prepared by Blackburne 08-08-25 Jackson 23098/C00 F Cover Sheet and Drawing Index, prepared by 07.08.25 Morgan Consulting Engineers 23098/C01 B Bulk Earthworks Layout Plan, prepared by 07.08.25 Morgan Consulting Engineers 23098/C02 A Bulk Earthworks Sections, prepared by 07.08.25 Morgan Consulting Engineers 23098/C03 B Concept Erosion and Sediment Control Plan 09.08.24 – Pre Construction, prepared by Morgan Consulting Engineers 23098/C04 B Concept Erosion and Sediment Control Plan 09.08.24 – Pre Construction, prepared by Morgan Consulting Engineers 23098/C05 B Concept Erosion and Sediment Control 09.08.24 Details, prepared by Morgan Consulting Engineers 23098/C10 I Site Works and Drainage Plan Layout Plan, 19.08.25 prepared by Morgan Consulting Engineers 23098/C11 H Site Works and Drainage Plan – Sheet 1, 19.08.25 prepared by Morgan Consulting Engineers 23098/C12 H Site Works and Drainage Plan – Sheet 2, 19.08.25 prepared by Morgan Consulting Engineers 23098/C13 G Site Works and Drainage Details – Sheet 1, 19.08.25 prepared by Morgan Consulting Engineers 23098/C14 F Site Works and Drainage Details – Sheet 2, 19.08.25 prepared by Morgan Consulting Engineers RG Strategic Planning Report – Minor Change Application 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original