Minor Change - Planning Report 22.08.2028
23098/C15 C Site Works and Drainage Details – Sheet 3, 19.08.25
prepared by Morgan Consulting Engineers
23098/C20 F Stormwater Drainage Catchment Plan, 19.08.25
prepared by Morgan Consulting Engineers
23098/C21 F Stormwater Drainage Long Sections, 19.08.25
prepared by Morgan Consulting Engineers
23098/C22 F Stormwater Drainage Calculations, 19.08.25
prepared by Morgan Consulting Engineers
23098/C30 F External Roadworks Plan, prepared by 19.08.25
Morgan Consulting Engineers
23098/C40 B Sewage Plan Plan, prepared by Morgan 09.08.24
Consulting Engineers
23098/C50 B Water Reticulation Plan, prepared by 09.08.24
Morgan Consulting Engineers
23098/C51 A Water Reticulation Details, prepared by 09.08.24
Morgan Consulting Engineers
23098/C60 B Pavement Jointing Plan, prepared by Morgan 07.08.25
Consulting Engineers
23098/C61 B Pavement Jointing Details, prepared by 08.08.25
Morgan Consulting Engineers
10. Proposed to amend condition 63
The condition requires amending to reflect the new allocated MCU number and to read as
follows.
63. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. The relevant conditions of the higher order Material Change of Use approval viz.
MCU21/0117.01 MCU21/0117.02 to which this approval relates;
c. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines;
d. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site.
RG Strategic Planning Report – Minor Change Application 12