Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

13. OBoat Hire - Prescribed Tidal Works Code

Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.

of 27

Page text shows just the words. Original shows the document exactly as it was published.

NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria                     Acceptable Solution                       Comments

                                              the standard in paragraph (a) –
                                              the relevant planning scheme
                                              standard, to the extent it is more
                                              stringent than the standard in
                                              paragraph (a);
                                         c) any other relevant planning scheme
                                         standard that is not inconsistent with
                                         the standards in paragraphs (a) and
                                         (b).



Performance Criteria                     Acceptable Solution                       Comments

Public access – safety

9.1     The location and design of       Public access to State coastal land       Compliant.
prescribed tidal works does not          near the prescribed tidal works is
adversely affect the safety of           consistent   with   each   relevant
members of the public accessing          planning scheme standard.
State coastal land.                                                                The proposed redevelopment is fully
                                                                                   contained within the boundaries of
                                                                                   the existing seabed lease area. The
                                                                                   proposed works will therefore not
                                                                                   affect the safety of members of the
                                                                                   public accessing the foreshore as the
                                                                                   seabed lease area will not change.



Performance Criteria                     Acceptable Solution                       Comments

Navigable access to, or egress from, lots that adjoin, or are in the immediate surroundings of, a lot connected to
prescribed tidal works

10.1 Prescribed tidal works that are     The design and construction of the        Compliant.
for a private purpose do not adversely   prescribed tidal work is consistent
affect navigable access to, or           with the following standards:-
navigable egress from, any lot that
adjoins, or is in the immediate              a)    subject to paragraph (b),       The proposed redevelopment is
surroundings of, a lot connected to                                                subject the boundaries of the existing
                                                   prescribed tidal works:-
prescribed tidal works.                                                            seabed lease. All proposed works and
                                             i) for a lot connected to the
                                                                                   any vessels moored at the facility
                                                 works for which there is a        must remain wholly within the
                                                 water allocation area – are not   boundaries of the lease. This ensures
                                                 constructed outside the water     the proposal meets with the
                                                 allocation area; and              performance criteria 10.1.
                                             ii) for a lot connected to works
                                                 for which there is no water
                                                 allocation area – are no closer
                                                 than 1.5m to that lot’s side
                                                 boundary or extended side
                                                 boundary;
                                         b) if a relevant planning scheme
                                         standard is more stringent than the
                                         standard mentioned in paragraph (a)
                                         – the relevant planning scheme
                                         standard, to the extent it is more
Log in to download the original file

13. OBoat Hire - Prescribed Tidal Works Code.pdf · 289 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.