Original source · versioned page text
13. OBoat Hire - Prescribed Tidal Works Code
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria Acceptable Solution Comments
the standard in paragraph (a) –
the relevant planning scheme
standard, to the extent it is more
stringent than the standard in
paragraph (a);
c) any other relevant planning scheme
standard that is not inconsistent with
the standards in paragraphs (a) and
(b).
Performance Criteria Acceptable Solution Comments
Public access – safety
9.1 The location and design of Public access to State coastal land Compliant.
prescribed tidal works does not near the prescribed tidal works is
adversely affect the safety of consistent with each relevant
members of the public accessing planning scheme standard.
State coastal land. The proposed redevelopment is fully
contained within the boundaries of
the existing seabed lease area. The
proposed works will therefore not
affect the safety of members of the
public accessing the foreshore as the
seabed lease area will not change.
Performance Criteria Acceptable Solution Comments
Navigable access to, or egress from, lots that adjoin, or are in the immediate surroundings of, a lot connected to
prescribed tidal works
10.1 Prescribed tidal works that are The design and construction of the Compliant.
for a private purpose do not adversely prescribed tidal work is consistent
affect navigable access to, or with the following standards:-
navigable egress from, any lot that
adjoins, or is in the immediate a) subject to paragraph (b), The proposed redevelopment is
surroundings of, a lot connected to subject the boundaries of the existing
prescribed tidal works:-
prescribed tidal works. seabed lease. All proposed works and
i) for a lot connected to the
any vessels moored at the facility
works for which there is a must remain wholly within the
water allocation area – are not boundaries of the lease. This ensures
constructed outside the water the proposal meets with the
allocation area; and performance criteria 10.1.
ii) for a lot connected to works
for which there is no water
allocation area – are no closer
than 1.5m to that lot’s side
boundary or extended side
boundary;
b) if a relevant planning scheme
standard is more stringent than the
standard mentioned in paragraph (a)
– the relevant planning scheme
standard, to the extent it is more
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.