Original source · versioned page text
13. OBoat Hire - Prescribed Tidal Works Code
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria Acceptable Solution Comments
stringent than the standard
mentioned in paragraph (a).
Performance Criteria Acceptable Solution Comments
Infrastructure, including, access, parking, sewerage and water services
11.1 Prescribed tidal work has The infrastructure for prescribed tidal Compliant.
appropriate infrastructure, including, work is consistent with each relevant
in particular, road access, parking planning scheme standard.
facilities, sewerage services and water
services, having regard to the The proposed redevelopment will not
following:- change the infrastructure or services
required to the lease area.
a) the nature and scale of the work;
The redevelopment is merely for
and improved and safer vessel mooring
b) the number of people that may and passenger/staff safety at
be on or at the work at any time; accessing the hire vessels.
and
c) the number of vehicles that may No vegetation will be disturbed,
be on or moored at the work at damaged or removed along the
foreshore as part of the works.
any time; and
d) the protection of any foreshores
near the work and the vegetation
and marine plants on the
foreshores
Performance Criteria Acceptable Solution Comments
Design, construction and safety – all prescribed tidal work
12.1 Prescribed tidal works are The design and construction of the Compliant.
designed and constructed in a way to prescribed tidal work is consistent
ensure it is structurally sound, having with the following standards:-
regard to the following:-
a) subject to paragraph (c), each The proposed structure will be
a) relevant engineering standards; consistent with the relevant Australian
Australian Standard relevant to
Standards. All requirements are
b) the location of the work; the design or construction of
addressed in the engineered plans
c) the purpose for which the work is structures, to the extent and in the structural design report.
to be used; requirements stated in the
d) the impact of flooding, storm Standard apply to the design or
tide, overtopping by waves, construction of prescribed tidal
projected sea level rise, tidal works;
influences and hydrodynamic b) subject to paragraph (c), the
forces; projected sea level rise is
e) the design life of the works; factored into the design and
f) the dead load of the works and construction of the prescribed
the intended live load for the tidal works;
works; c) if a relevant planning scheme
g) the impact of hydrostatic standard is more stringent than
pressures on the works; any standard mentioned
h) the stability of individual paragraph (a) – the relevant
components of the works, planning scheme standard, to the
extent it is more stringent than
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.