13. OBoat Hire - Prescribed Tidal Works Code

Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.

of 27

Page text shows just the words. Original shows the document exactly as it was published.

NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria                      Acceptable Solution                       Comments

                                          stringent   than    the     standard
                                          mentioned in paragraph (a).



Performance Criteria                       Acceptable Solution                      Comments

Infrastructure, including, access, parking, sewerage and water services

11.1      Prescribed tidal work has       The infrastructure for prescribed tidal   Compliant.
appropriate infrastructure, including,    work is consistent with each relevant
in particular, road access, parking       planning scheme standard.
facilities, sewerage services and water
services, having regard to the                                                      The proposed redevelopment will not
following:-                                                                         change the infrastructure or services
                                                                                    required to the lease area.
a)  the nature and scale of the work;
                                                                                    The redevelopment is merely for
    and                                                                             improved and safer vessel mooring
b) the number of people that may                                                    and    passenger/staff      safety at
    be on or at the work at any time;                                               accessing the hire vessels.
    and
c) the number of vehicles that may                                                  No vegetation will be disturbed,
    be on or moored at the work at                                                  damaged or removed along the
                                                                                    foreshore as part of the works.
    any time; and
d) the protection of any foreshores
    near the work and the vegetation
    and marine plants on the
    foreshores
Performance Criteria                      Acceptable Solution                       Comments

Design, construction and safety – all prescribed tidal work

12.1    Prescribed tidal works are        The design and construction of the        Compliant.
designed and constructed in a way to      prescribed tidal work is consistent
ensure it is structurally sound, having   with the following standards:-
regard to the following:-
                                          a)   subject to paragraph (c), each       The proposed structure will be
a)   relevant engineering standards;                                                consistent with the relevant Australian
                                               Australian Standard relevant to
                                                                                    Standards.     All requirements are
b)   the location of the work;                 the design or construction of
                                                                                    addressed in the engineered plans
c)   the purpose for which the work is         structures,   to   the    extent     and in the structural design report.
     to be used;                               requirements stated in the
d)   the impact of flooding, storm             Standard apply to the design or
     tide, overtopping by waves,               construction of prescribed tidal
     projected sea level rise, tidal           works;
     influences and hydrodynamic          b)   subject to paragraph (c), the
     forces;                                   projected sea level rise is
e)   the design life of the works;             factored into the design and
f)   the dead load of the works and            construction of the prescribed
     the intended live load for the            tidal works;
     works;                               c)   if a relevant planning scheme
g)   the impact of hydrostatic                 standard is more stringent than
     pressures on the works;                   any      standard     mentioned
h)   the     stability   of  individual        paragraph (a) – the relevant
     components of the works,                  planning scheme standard, to the
                                               extent it is more stringent than
Log in to download the original file

13. OBoat Hire - Prescribed Tidal Works Code.pdf · 289 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.