GENERAL COMMITTEE MEETING AGENDA 12 January 2015
Criteria Planning Scheme Proposal Complies
Site cover 50% (565m2) on the ground floor and Garage Level X
2 2
30% (340m ) for the upper storey(s), - 28% (315m )
2
or - 11% (125m ) visible
2
40% (452m ) for all storeys.
Ground Level
2
- 35.3% (399m )
Upper Level
2
- 24.1% (272m )
Total Coverage
2
- 67% (755m )
2
- 43% (485m ) visible
2 2
226m (20%) of Soft Landscaping Area 210m (19%) X
Setbacks
Frontage (Mitti St) 6m 3.9m X
Frontage (Park Rd) 6m 2.5m X
Sides (south) 2.0m 2.0m
Sides (west) 2.0m 2.0m
Building height
in storeys 2 storeys max 2 storeys
in metres 8m max from Natural and Finished 12.9m to finished ground levels X
ground levels 8m to natural ground levels
Roof form
Roof Pitch 5 degrees 5 degrees
Eave overhangs 600mm to 75% 600mm to 75%
Carparking 1 4
Site Cover / Soft Landscaping
Probable Solutions S9.1 & S9.2 seek that the site cover of buildings does not exceed 50% on the
ground floor and 30% on the upper floor; with a minimum of 20% of the site provided for soft
landscaping.
Site cover refers to the total proportion of a site covered by all buildings and structures shown as
a percentage. From a birds-eye view of the site, the total site coverage is 67% (755m2).
The proposed building is set over three levels and steps up the hill, with a large grassed/terraced
podium level, which is located directly above the garage. A pool sits above the garage and
extends out in to the north eastern portion of the site, with a roof extending out over part of the
podium.
The following diagram identifies those areas at the garage level that will be more than 1m above
natural ground level.
Page 43 of 147
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.