Log in to see the plans as drawn8. ANNEX A: Levels of Service
Asset Management Plan: Pathways and Boardwalks Page 26
ele! NOOSA Btatet
ms meestseiy SERVICE LEVEL CATALOGUE
Service Listing 1 of 2
Service Output PATHWAYS, BOARDWALKS & RECREATION TRAILS
Provision and maintenance of pathways including off-road shared
pathways, pedestrian underpasses, boardwailks and recreation trails
(Tracks & Trails).
Service Activity Pathways & Boardwalks
The activities include inspections and routine maintenance and cleaning
of sealed paths and elevated structures to provide safe off road transport
and recreation options principally for pedestrians and cyclists.
——
TOSSES SSS
Cost Centres Pathways 2009
Hastings St Maintenance Levy 2002
Arborist Services 2303
Management Civil Operations 2000
Works Operations Coordination 2021
Works Operations 2704
Key Statistics Pathways 237 km
Boardwalks 4.8 km
Recreation Trails 40
Legislative responsibility to The Land Act — as trustee of reserve
provide this service
SERVICE DELIVERY MODEL
Service predominately provided in-house with contractor services utilised for activities such as pressure cleaning
and resealing of footpath paving in key town centres.
ACTIVITY SERVICE LEVEL TARGET
Maintenance
[inspections and routine maintenance works to provide a safe functional surface. May include grinding off uneven
weds OF PaliiWwa SULTS Pe icrl o. ~ SV Neale OF PalriWway alice
Note: A revised schedule of inspections and scheduled works program is being trialled and will be assessed /
adjusted as necessary. Work Orders are generated ad hoc due to system limitations.
The Recurrent Maintenance Manual provides for an inspection and routine maintenance schedule of every 4
months.
Pathways include elevated boardwalk structures that form part of a pathway, but do not bridge a waterway or other
feature.
Cyclic inspections (defects) | —sPrecinct — | SCStrategic §=F——C sd] CS CiLcal’—CSCsd
ee
Scheduled work As identified from inspections (defects & proactive interventions) to maintain
asset serviceability based risk prioritisation and desired response times below:
Trip Hazards — urgent
Trip Hazards — high
Trip Hazards — med / low
Slippery Surface
Asset Management Plan: Pathways and Boardwalks Page 26See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.