Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Asset Management Plan: Pathways and Boardwalks   Page 27

ACTIVITY                                 iA eee      ee     cl ae
         Surface Defects
        ‘tn                              meee        |     Mere            |     Shere
         high
        Uneven/broken Path —       20 business days       40 business days      130 business days
         non-urgent

    ched                        Hastings St additional works (levy)
                                Pressure washing and resealing coloured concrete Twice a year / levy
                                Zones (includes pedestrian crossings in the road and | covers 1 extra service
                                some footpath areas)
                                Seal granite pavers with non-slip coating     Every 5 years
  Reactive work [customer       Issue                 First response          Target for completion
  requests] 7                   General pathway        As per prioritisation 20 days
                                maintenance issues (e.g. | above
                                 uneven surface
                                Hazard (trip/fall;    As per prioritisation   5 days
                                obstruction)           above
   Operations
  [Removal of debris, dead animals and graffiti as well as sweeping/cleaning of path surfaces, painting of timber
   JOCAN KYOTO We  SU ULIUI ES UNIS OT OVO icing ay Li OOS,
  Cyclic inspections            These items are picked up as part of the maintenance inspection program
                                other than for contracted works as follows:
                                Public space cleaning contracts all town precincts Monthly — locations
                                 (includes pathway sweeping & litter pick-up) selected ad hoc
  Scheduled Work                                    Jeaning/litter pick-up (Contract
                                ¢  Peregian Beach; Sunshine Beach; Sunrise
                                   Beach; Noosa Junction; Noosa Heads; Noosaville
                                   & Tewantin
                               je BoreenPoint&Cooroy WORK
                                venir                                         a
                                Hasting Street                                Twice yearly (.
                                                                              service levy funded)
                                                                              Note: LOS under
                                                                              review due to impact
                                                                              of cleaning on anti-slip
                                                                              treatment applied to
                                Peregian Beach
                                Sunshine Beach
                                Noosa Junction - (a section in front of surf shop Annually (base level
                                currently done monthly at seats due to bad stains) service)
                                Tewantin
                                Rest of the town centres and other pathways (as
                                required basis)
  Reactive work [customer       issue                                         Target for completion _|
  requests}!                    a

Asset Management Plan: Pathways and Boardwalks                                           Page 27
Log in to download the original file

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.