2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnAsset Management Plan: Pathways and Boardwalks Page 27
ACTIVITY iA eee ee cl ae
Surface Defects
‘tn meee | Mere | Shere
high
Uneven/broken Path — 20 business days 40 business days 130 business days
non-urgent
ched Hastings St additional works (levy)
Pressure washing and resealing coloured concrete Twice a year / levy
Zones (includes pedestrian crossings in the road and | covers 1 extra service
some footpath areas)
Seal granite pavers with non-slip coating Every 5 years
Reactive work [customer Issue First response Target for completion
requests] 7 General pathway As per prioritisation 20 days
maintenance issues (e.g. | above
uneven surface
Hazard (trip/fall; As per prioritisation 5 days
obstruction) above
Operations
[Removal of debris, dead animals and graffiti as well as sweeping/cleaning of path surfaces, painting of timber
JOCAN KYOTO We SU ULIUI ES UNIS OT OVO icing ay Li OOS,
Cyclic inspections These items are picked up as part of the maintenance inspection program
other than for contracted works as follows:
Public space cleaning contracts all town precincts Monthly — locations
(includes pathway sweeping & litter pick-up) selected ad hoc
Scheduled Work Jeaning/litter pick-up (Contract
¢ Peregian Beach; Sunshine Beach; Sunrise
Beach; Noosa Junction; Noosa Heads; Noosaville
& Tewantin
je BoreenPoint&Cooroy WORK
venir a
Hasting Street Twice yearly (.
service levy funded)
Note: LOS under
review due to impact
of cleaning on anti-slip
treatment applied to
Peregian Beach
Sunshine Beach
Noosa Junction - (a section in front of surf shop Annually (base level
currently done monthly at seats due to bad stains) service)
Tewantin
Rest of the town centres and other pathways (as
required basis)
Reactive work [customer issue Target for completion _|
requests}! a
Asset Management Plan: Pathways and Boardwalks Page 27See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.