              Exclusion zones will be maintained and adhered to.
        5
        5   Hutchinson Builders’ Checklist/s are to be completed prior to      Site manager /
            the erection of crane – the site management team is to assess      subcontractor /
            the erected crane’s capabilities for lifting over workers          Crane Supervisor
            The following falling objects controls will be implemented:        Site manager /
        3     Use of barricading to establish exclusion zones whilst          subcontractor /
                erecting / dismantling / conducting climbing operations;       Crane Supervisor
        6     Tool lanyards;
        4     Mesh screens;
        5     Scheduling work for peak / off peak times (as
        4       appropriate);
              Restraining crane components (e.g. through the use of a
                chain between the component and the crane).
                                                                               Site manager
            Daily inspections will be undertaken to and results of these
        5                                                                      /subcontractor /
            inspections will be entered into the logbook.
                                                                               Crane Supervisor
            Where possible the general lifting of loads over workers shall     Site Foreman / crane
            be carried out in a manner that the site foreman consults with     crew
        5   the dogman to establish a common crane travel path over the
            project to minimise the time the load is suspended over
            workers
        3   For lifting concrete panels a designated crane travel path shall   Site Foreman / crane
            be established and the area will be excluded from workers          crew
            together with the panel placement area.
        5   Where cranes are to be erected in flight paths the specific        Site Manager /
            requirements of CASA will be met.                                  Subcontractor
        5                                                                      Site manager /
            Workboxes and first aid boxes will be used in accordance with
                                                                               subcontractor /
            the relevant codes of practice and Australian standards.
                                                                               Crane Supervisor
            Tower cranes will not be left unattended unless:                   Site Manager /
        4   - all loads are removed from the hook;                             Subcontractor
        4   - the hook has been raised to a position where it is safely
        3       clear of other operations;
        3   - all powered motions have been disabled;
        4   - the keys have been removed from the crane; and
            - tethering has been implemented as required.
        5   Associated rigging equipment shall be inspected and tested in      Site Manager /
            accordance with relevant Codes of Practice and Australian          Subcontractor
            Standards by a competent person – examples:
WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                Page 16

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.