Exclusion zones will be maintained and adhered to.
5
5 Hutchinson Builders’ Checklist/s are to be completed prior to Site manager /
the erection of crane – the site management team is to assess subcontractor /
the erected crane’s capabilities for lifting over workers Crane Supervisor
The following falling objects controls will be implemented: Site manager /
3 Use of barricading to establish exclusion zones whilst subcontractor /
erecting / dismantling / conducting climbing operations; Crane Supervisor
6 Tool lanyards;
4 Mesh screens;
5 Scheduling work for peak / off peak times (as
4 appropriate);
Restraining crane components (e.g. through the use of a
chain between the component and the crane).
Site manager
Daily inspections will be undertaken to and results of these
5 /subcontractor /
inspections will be entered into the logbook.
Crane Supervisor
Where possible the general lifting of loads over workers shall Site Foreman / crane
be carried out in a manner that the site foreman consults with crew
5 the dogman to establish a common crane travel path over the
project to minimise the time the load is suspended over
workers
3 For lifting concrete panels a designated crane travel path shall Site Foreman / crane
be established and the area will be excluded from workers crew
together with the panel placement area.
5 Where cranes are to be erected in flight paths the specific Site Manager /
requirements of CASA will be met. Subcontractor
5 Site manager /
Workboxes and first aid boxes will be used in accordance with
subcontractor /
the relevant codes of practice and Australian standards.
Crane Supervisor
Tower cranes will not be left unattended unless: Site Manager /
4 - all loads are removed from the hook; Subcontractor
4 - the hook has been raised to a position where it is safely
3 clear of other operations;
3 - all powered motions have been disabled;
4 - the keys have been removed from the crane; and
- tethering has been implemented as required.
5 Associated rigging equipment shall be inspected and tested in Site Manager /
accordance with relevant Codes of Practice and Australian Subcontractor
Standards by a competent person – examples:
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.