             from a geo-technical engineer where a mobile crane is to
             perform any of the following lifts:
             a. bridge beams;
             b. tilt-up panels; and
             c. Any other heavy lift where the load is 50 tonnes or more.
        5   All cranes on site will be operated in accordance with the        Subcontractor
            manufacturer’s recommendations and requirements and
            these requirements must be reflected in the H&S
            documentation submitted. If in doubt, the crane will not be
            erected/ operated until specific requirements have been
            determined to ensure safe operation.
        5    A tower crane will be used on site with the following evidence     Site Manager /
             maintained on site:                                                Subcontractor
             - Tower crane design registration.
             - Tower crane registration.
             - Certification of the base design by an engineer and the
                 inspection requirements prior to pouring.
             - The area around the crane is suitably barricaded off during
                 erection.
             - Full details of the procedures for operation of the tower
                 crane.
             - Load charts, in English, fixed in the operator’s cabin in a
                 visible location (with stability information for mobile
                 cranes).
             - Certification that the following items meet the required
                 safety standards:
              o Tower bolts, tower to building ties, bracing and bolting
              o Access ladders, platforms and guardrails
              o Cleanliness of towers and crane generally
              o Condition of ropes and sheaves
              o Checking limits and safety devices
              o Correct load radii indicator, Hook height indicator, Load
                  weight indicator, motion limiting devices, rated capacity
                  limiters.
              o Wind speed indicator, audible warning devices
              o Letter of acceptance for the crane installation and tower
                  to building ties where applicable
              o Completion of log sheets
              o Operation of load limiting device
            Where there is a risk of contact with power lines:                Site manager /
        3    The power lines will be de-energised and written                subcontractor /
               confirmation of isolation provided by electrical entity; or    Crane Supervisor
WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                              Page 15

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.