Original PDF page 101, section 1. The text section number identifies this passage in the reader.

                                                               - Round synthetic sling – every 3 months
                                                               - Fat synthetic webbing sling – every 3 months
                                                               - Linked chain slings – every 12 months
                                                               - Lifting clutches – every 12 months
                                                          5   In the event of impending inclement weather site                                       Site Manager /
                                                              management and crane crew are to check Bureau of                                       Subcontractor
                                                              Meteorology for impending weather conditions and where
                                                              identified cease or alter activities accordingly.
                                          A   4    E23    5   A Demolition Work Plan, which takes into account, the                 WHS Act         Site Manager /
    Demolition    Collapse of
☐                  structures/buildings
                                                              requirements of AS 2601 will be provided for all demolition            2011
                                                                                                                                     Chapter 2       Subcontractor
                                                              activities.
                                                                                                                                    WHS Reg
                  Exposure to                            5   The Demolition Work Plan will include details of results of            2011            Site Manager /
                   hazardous materials                        investigations as required by AS 2601.                                 Chapter 4       Subcontractor
                                                                                                                                     Part 4.6
                  Falling objects                        5   The Demolition Work Plan will include all relevant SWMS as            VIC OHS Act     Site Manager /
                                                              required by the relevant state legislation.                            2004 Part 6     Subcontractor
                  Flying                                                                                                           VIC OHS Reg
                   particles/materials                    5   Copies of business certificate for demolition and asbestos             2007 Part       Site Manager /
                                                              removal contractor will be obtained.                                   3.5, 4.3, 6.1   Subcontractor
                                                                                                                                    AS2601 –
                                                          5   Copies of permits / notifications (as required by relevant state       The             Site Manager /
                                                              legislation) will be obtained.                                         demolition      Subcontractor
                                                                                                                                     of structures
                                                          5   Name and details of competent person to supervise                     Demolition      Site Manager /
                                                              demolition activities to be obtained.                                  Work QLD        Subcontractor
                                                                                                                                     COP 2013
                                                              Controls will be in place to prevent falling objects hitting the      Demolition      Site Manager /
                                                              public in adjoining areas by:                                          Work NSW        Subcontractor
                                                          3        Closing adjoining areas (to exclude all persons) to the          Code Of
                                                                                                                                     Practice
                                                                        extent necessary to prevent objects contacting               2014
                                                                        persons;                                                    Demolition
                                                          3        Erecting perimeter containment screening along                   VIC Code Of
                                                                        each part of the structure from which an object could        Practice
                                                          5             fall;                                                        1991
                                                                                                                                    Demolition
                                                                   Another control measure to stop objects from falling             Work SA
                                                                        on or hitting persons (detail).                              Code Of
                                                          4   Where overhead protective structures are provided over                 Practice        Site Manager /
                                                              public walkways (between a public place and the building               2012
                                                                                                                                                     Subcontractor
                                                              being demolished) the structures will:                                Demolition
                                                                                                                                     Work TAS
                                                              a. Consist of a horizontal platform of solid construction with         Code Of
                                                                  vertical supports, and                                             Practice
                                                              b. Be at least 250 mm from the edge of the kerb of the                 2012
                                                                  walkway towards the common boundary of the walkway
                                                                  and the building that is being demolished, and

                                                  WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                      Page 17

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.