            c. have a minimum overhead clearance of 2.2 m to any
                 bracings, beams or any other part of the overhead
                 protective structure, and
            d. have a continuous solid up stand projecting at least one
                 meter above the platform surface, and
            e. be designed for a uniformly distributed live load of 10kPa
        5   Where the demolition is adjacent to another building controls       Site Manager /
            will be implemented to protect:                                     Subcontractor
            - the other building; and
            - any person entering/leaving the other building; and
            - any person who is on top of the other building (as
                  applicable).
        4   Where perimeter containment screening is erected or altered         Site Manager /
            controls will be implemented to prevent any part of the             Subcontractor
            screening falling on a person.
        3   Where demolished materials are to be lowered onto / into a          Site Manager /
            public place, the area will be properly barricaded to prevent       Subcontractor
            members of the public entering.
        4   Where scaffolding is provided it will be:                           Site Manager /
            - erected before the demolition work starts on the side of          Subcontractor
                  the building that is being demolished faces a public place
                  and be kept erected until the work is finished; and
            - provided with at least 2 but not more than 3 platforms
                  unless certified by an engineer; and
            - each platform will extend the full width of the scaffold
                  frame; and abut the building; and extend into any
                  openings of the building for a sufficient distance to catch
                  any falling material;
            The above will occur in accordance with the relevant state
            legislation.
        5   If mechanical means are used to carry out the demolition            Site Manager /
            work, the work is to be carried out sequentially.                   Subcontractor
        5   Demolition work involving pulling with ropes or chains or           Site Manager /
            similar means will only be carried out if the building being        Subcontractor
            demolished is not more than 4 metres in height and the work
            is carried out sequentially.
        3   Persons will not be allowed to work in or below a building          Site Manager /
            being demolished if there is a danger of demolished or other        Subcontractor
            material falling or rebounding.
        5   The demolition of chimney stacks will be in accordance with         Site Manager /
            the relevant state legislation.                                     Subcontractor

WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                 Page 18

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.