c. have a minimum overhead clearance of 2.2 m to any
bracings, beams or any other part of the overhead
protective structure, and
d. have a continuous solid up stand projecting at least one
meter above the platform surface, and
e. be designed for a uniformly distributed live load of 10kPa
5 Where the demolition is adjacent to another building controls Site Manager /
will be implemented to protect: Subcontractor
- the other building; and
- any person entering/leaving the other building; and
- any person who is on top of the other building (as
applicable).
4 Where perimeter containment screening is erected or altered Site Manager /
controls will be implemented to prevent any part of the Subcontractor
screening falling on a person.
3 Where demolished materials are to be lowered onto / into a Site Manager /
public place, the area will be properly barricaded to prevent Subcontractor
members of the public entering.
4 Where scaffolding is provided it will be: Site Manager /
- erected before the demolition work starts on the side of Subcontractor
the building that is being demolished faces a public place
and be kept erected until the work is finished; and
- provided with at least 2 but not more than 3 platforms
unless certified by an engineer; and
- each platform will extend the full width of the scaffold
frame; and abut the building; and extend into any
openings of the building for a sufficient distance to catch
any falling material;
The above will occur in accordance with the relevant state
legislation.
5 If mechanical means are used to carry out the demolition Site Manager /
work, the work is to be carried out sequentially. Subcontractor
5 Demolition work involving pulling with ropes or chains or Site Manager /
similar means will only be carried out if the building being Subcontractor
demolished is not more than 4 metres in height and the work
is carried out sequentially.
3 Persons will not be allowed to work in or below a building Site Manager /
being demolished if there is a danger of demolished or other Subcontractor
material falling or rebounding.
5 The demolition of chimney stacks will be in accordance with Site Manager /
the relevant state legislation. Subcontractor
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.