5 At least two clearly marked, illuminated and unobstructed Site Manager /
access and egress routes are provided as an emergency exit Subcontractor
connecting all un-demolished floors to the nearest street.
5 Details (prescribed information) about underground services Site Manager /
are recorded in writing and given to each person who is to do Subcontractor
demolition work.
5 A copy of certification of the disconnection of services from Site Manager /
the relevant authority is retained on site. Subcontractor
5 Asbestos report from client or an appropriately qualified Site Manager /
person who has examined the building or structure for the Subcontractor
presence of asbestos.
1 All hazardous substances, lead and asbestos will be removed Site Manager /
prior to demolition. Subcontractor
5 Engineer’s investigation and certificate to support demolition Site Manager /
machinery on structure. 5Subcontractor
5 The demolition area will be defined and non-essential Site Manager /
personnel will be excluded from this area. Subcontractor
5 Signs stating “Danger! Demolition in Progress” or similar will Site Manager /
be erected. Subcontractor
5 Hutchinson’s demolition checklist is to be completed prior to Site Manager /
work starting. Foreman
C 4 E18 5 Determine the risk management processes for fulfilling H&S WH S Act D4 Designers /
☒ Design Risk
Manageme
Exposure to unsafe
practices by the end
obligations for the project:
2011 Part 2
VIC OH&S H14 Consultants
Design and Construct Piling Only Project Manger
nt user Act 2004
Construct Only Section 21 -
Exposure to un safe 5 Design & Construct Project 23, 26 & 31 Project Manger
work practices during Consultation with all designers and consultants to ensure Safe Design Designers
construction they are made aware that their design is to meet; of Structures
QLD Code Of
Consultants
- all legislative requirements
Exposure to injury Practice
- incorporate control measures to remove or reduce H&S 2013
due to change of
implications to an acceptable level Safe Design
materials or Of Structures
Particular design briefs need to consider the health and
substance NSW Code
safety of persons;
Of Practice
- During construction of the structure/equipment 2014
- When the structure /equipment has been constructed Safe Design
and is used by the end user Of Buildings
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.