 Exposure to injury           5   Designers/consultants are to provide to the project team a             And             Project Manger
                                                                                                          Structures
  due to change in                 documented design risk assessment addressing the issues                                Designers
                                                                                                          WA Code Of
  design                           described above;                                                       Practice        Consultants
                                    - Hutchinson Builders Design Risk Assessment Form (HB-                2008
 Exposure to injury                                                                                  
                                         HSEQ-F-023-A) may be used as a minimum for a design              Safe Design
  due to change in                                                                                        Of Structures
                                         risk assessment
  Plant/equipment                                                                                         TAS Code Of
                               5   Regular meetings to be scheduled with designers/consultants            Practice        Project Manger
  design
                                   to review and where possible close out action/issues raised in         2012            Designers
                                   the design risk assessment
                               5   Construct Only Project                                                                 Client
                                   Consult with the client to identify if there has been a design                         Project Manger
                                   risk assessment been carried out for the project;
                                    - If one is provide by the client - then review and any new
                                         constructability hazards can be transfer to the Project
                                         Risk Assessment
                               5   Where a design risk assessment is not provide by the client,                           Project Manger
                                   the H&S implication for construction shall be managed as per                           Site Manager
                                   the identified hazards identified in Hutchinson Builders Project                       Foreman
                                   Risk Assessment and Risk Assessment Procedure MP:10
                               5   Where there are design changes in relation to both Design &                            Project Manger
                                   Construct and Design Only projects the site team is to                                 Site Manager
                                   undertake a preliminary assessment and;                                                Foreman
                                    - Record yes or no on the project variation register to
                                         identify if the changes may impact on the site health and
                                         safety that involve change in;
                                              New construction materials
                                              Construction processes
                                              Construction techniques previously used
                                              Introduction of new hazardous materials
                                              Amend or develop a new work method statement
                                                  for the change being made
                               5   Where YES has been recorded on the variation register the site                         Project Manger
                                   team is to undertake a design changes assessment using;                                Site Manager
                                    - Hutchinson Builders form HB-HSEQ-F-023-A Design                                     Foreman
                                         Change Risk Assessment
                               5   Results of the design change risk assessment are to be                                 Project Manger
                                   communicated to the relevant subcontractors or employees                               Site Manager
                                   and involve a tool box talk to inform the relevant workers                             Foreman




                       WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                           Page 20

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.