B 5 E24 5 Persons will not undertake any form of electrical work, unless WHS Act D4 Site Manager /
Electricity Contact with
☒ Supply overhead power lines
that person holds an appropriate licence for the work.
2011 Part 18
VIC OHS Act H14
Subcontractor
4 In multi-level buildings distribution boards will be positioned Site Manager /
2004 Part 3
Trips and Falls in a manner, which eliminates the need for electrical leads to Electrical
Subcontractor
be run between levels (one per level). Safety Act
Contact with
5 Temporary electrical installations will be installed and 1998 - VIC Site Manager /
underground services Electrical
maintained in accordance with AS 3012. Subcontractor
Safety Act
Electrical fires 4 Site Manager /
Earth leakage units will be supplied to all switchboards. 2002 - QLD
Subcontractor
Faulty wiring Electrical
5 Earth leakage units will be tested monthly by a push button Safety Reg Site Manager /
test and every 3 months by a person holding either an 2013 - QLD Subcontractor
Electrical Work Licence or an Electrical Contractor Licence. Work Near
Exposed Live
5 All wiring (including switchboards) will be inspected and Parts COP
Site Manager /
tested by a licenced electrician after completion of the wiring 2010 - QLD Subcontractor
and prior to connection for normal use and at 6 monthly Managing
intervals. Certificates of compliance will be issued to Electrical
Risks In The
Hutchinson Builders and to the relevant electricity authority as
Workplace
required. COP 2014
5 All inspections, tests and maintenance carried out on electrical NSW Site Manager /
installations and plant / equipment will be recorded and kept Managing Subcontractor
onsite. Electrical
Risks In The
4 Overhead wiring will be positioned to avoid crossing roadways Workplace Site Manager /
or access ways where cranes, high loads or heavy machinery COP 2012 – Subcontractor
may travel. SA / TAS
5 Construction wiring will be visually inspected to verify the Working Site Manager /
Near
integrity of the installation every six (6) months, with records Overhead
Subcontractor
of inspections maintained on site. Power Lines
4/ Construction wiring will not be tied, bundled or grouped with NSW COP Site Manager /
5 permanent wiring. It will be readily distinguishable from 2006 Subcontractor
permanent wiring by using cable of a different colour (except Electrical
Practices For
green), or by attaching iridescent yellow tape at intervals of Construction
not more than five (5) metres and stamped with the words Work COP
“construction wiring.” 2007 NSW
4 Emergency lighting at a minimum level of 20 lux will be Framework Site Manager /
for
provided with a minimum of one (1) hour capacity following Undertaking Subcontractor
the loss of normal lighting to allow safe egress from the Work Near
building and lift shaft. Overhead &
5 Power points installed inside relocatable premises will only be Undergroun Site Manager /
d Assets VIC
used to supply power to electrical equipment and lighting Industry Subcontractor
within that relocatable premise.
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.