4 Flexible cords used in extension leads will be heavy duty Standard Site Manager /
2006
sheathed, have a minimum 10amp rating, and a minimum Subcontractor
Temporary
cable size of; electrical
1mm2 for a maximum cable length of 25m. installations
1.5mm2 for a maximum cable length of 30m. on
2.5mm2 for a maximum cable length of 50m – 15amp construction
site VIC
rating Industry
5 Flexible cords will comply with requirements for maximum Standard Site Manager /
length / current rating / conductor size applicable to the 2011 Subcontractor
relevant state.
4 Leads will not be joined to exceed the maximum length for the Site Manager /
thickness of the cable. Subcontractor
4 All lights will be supplied from a final sub-circuit of the Site Manager /
construction wiring and be provided with residual current Subcontractor
protection to a maximum rated residual current of 30mA.
4/ Portable lights will be protected against mechanical damage, Site Manager /
5 with mechanical guard for lamps and adequate stability. Subcontractor
5 All extension leads will be protected from mechanical damage, Site Manager /
heat sources and not to be laid in water or moist areas. Subcontractor
4 Where extension leads are run on insulated stands, hangers or Site Manager /
clip brackets, clearances of at least 2m will be maintained in Subcontractor
work areas and higher clearances where vehicles operate.
4 Extension leads are not to be wrapped or slung off metal Site Manager /
piping, lift cages, scaffolding or any other non-insulated Subcontractor
bracket or fixing – an insulated type hanger or stand must be
used.
5 Safe approach distances will be determined by plant operators Site Manager /
and/or the Site Supervisor using the COP: Working Near Subcontractor
Exposed Live Parts and Electrical Safety Act 2002 (or the
relevant state legislation / codes of practice / Australian
Standards) prior to any work commencing near overhead
power lines.
5 No worker, equipment, loads being moved, crane or plant will Site Manager /
be required to enter the exclusion zone around power lines. Subcontractor
5 A safety observer will work with the operator of any plant and Site Manager /
equipment, which could enter the exclusion zone. The safety Subcontractor
observer will have no other duty and will only observe one
crane or piece of plant at a time.
Switchboards must: Site Manager /
Subcontractor
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.