        4   Flexible cords used in extension leads will be heavy duty            Standard        Site Manager /
                                                                                 2006
            sheathed, have a minimum 10amp rating, and a minimum                                 Subcontractor
                                                                                Temporary
            cable size of;                                                       electrical
                   1mm2 for a maximum cable length of 25m.                      installations
                   1.5mm2 for a maximum cable length of 30m.                    on
                   2.5mm2 for a maximum cable length of 50m – 15amp             construction
                                                                                 site VIC
                      rating                                                     Industry
        5   Flexible cords will comply with requirements for maximum             Standard        Site Manager /
            length / current rating / conductor size applicable to the           2011            Subcontractor
            relevant state.
        4   Leads will not be joined to exceed the maximum length for the                        Site Manager /
            thickness of the cable.                                                              Subcontractor
        4   All lights will be supplied from a final sub-circuit of the                          Site Manager /
            construction wiring and be provided with residual current                            Subcontractor
            protection to a maximum rated residual current of 30mA.
       4/   Portable lights will be protected against mechanical damage,                         Site Manager /
       5    with mechanical guard for lamps and adequate stability.                              Subcontractor
        5   All extension leads will be protected from mechanical damage,                        Site Manager /
            heat sources and not to be laid in water or moist areas.                             Subcontractor
        4   Where extension leads are run on insulated stands, hangers or                        Site Manager /
            clip brackets, clearances of at least 2m will be maintained in                       Subcontractor
            work areas and higher clearances where vehicles operate.
        4   Extension leads are not to be wrapped or slung off metal                             Site Manager /
            piping, lift cages, scaffolding or any other non-insulated                           Subcontractor
            bracket or fixing – an insulated type hanger or stand must be
            used.
        5   Safe approach distances will be determined by plant operators                        Site Manager /
            and/or the Site Supervisor using the COP: Working Near                               Subcontractor
            Exposed Live Parts and Electrical Safety Act 2002 (or the
            relevant state legislation / codes of practice / Australian
            Standards) prior to any work commencing near overhead
            power lines.
        5   No worker, equipment, loads being moved, crane or plant will                         Site Manager /
            be required to enter the exclusion zone around power lines.                          Subcontractor
        5   A safety observer will work with the operator of any plant and                       Site Manager /
            equipment, which could enter the exclusion zone. The safety                          Subcontractor
            observer will have no other duty and will only observe one
            crane or piece of plant at a time.
            Switchboards must:                                                                   Site Manager /
                                                                                                 Subcontractor

WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                  Page 22

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.