Be connected to incoming supply by a direct method (e.g.
wired to terminals)
Be of robust construction with a minimum IP33 rating
(NSW) / IP23 rating (QLD)
Have a door or lid which can be locked, is attached so as
not to damaged cables / extension cords etc. and has a
means of keeping the door open when required for
electrical work.
Have doors / lids fixed so they are kept closed except for
access, need a tool to remove it (not slip hinges), are
lockable;
Be readily accessible, protected from damage and located
within the site perimeter;
Be positioned so that an appropriate flexible extension
cord of suitable length can be used.
Be securely attached to the floor, a pole, post, wall or be
of stable or freestanding type;
Have at least one (1) 10amp power point and at least one
(1) 15amp point;
Have a means of supporting electrical leads off the floor,
i.e. lead stand, cross arm;
Isolating switch i.e. “main switch”, “distribution board
isolation switch.” “isolating switch after-hours supply-do
not switch off”, must be marked as required by AS/NZS
3000 in letters 6mm high in contrasting colour to
background material;
Additional switches clearly identified for final sub circuits
intended to operate after hours, and emergency systems;
Isolating switches provided with isolating device for
securing in the open position;
Lockable covers (made from non-conductive materials)
provided over circuit breakers and RCD associated with
outgoing circuits, but does which does not prevent access
to isolating switches (unless the installation comprises of
only one final sub-circuit, or includes or incorporates a
combined mains circuit breaker / RCD as the main switch,
in which case the fitting of the lockable cover is not
required);
On the cover of the RCD’s and circuit breakers marked “In
the event of an RCD or circuit-breaker operating, the
cause of any fault should be assessed by a licenced
electrician before reset”;
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.