               Fix a caution or danger safety sign to advise of electrical
                hazard;
               Be singularly identifiable through either numbering,
                lettering or a combination of the two;
               Have live parts protected to prevent contact by anyone
                connecting or disconnecting plugs;
               Have an insulated anchorage tie bar provided if there are
                power points on the board to prevent straining on the
                cable going into the power supply;
               Have an insulated slot in the base for leads to go through
                and a sign fitted to it stating “keep closed – run all leads
                through bottom.”
        5   Switchboards will have at least 1m clearance provided in front      Site Manager /
            of the switchboard.                                                 Subcontractor
        3   All power circuits will be isolated and secured upon                Site Manager /
            completion of the work shift / when the site is unattended.         Subcontractor
            (This doesn’t apply to circuits supplying security lighting,
            essential equipment or to locked relocatable structures).
        5   Portable RCDs will be tested by the user before each use on a       Site Manager /
            daily basis and undergo an operating time at tripping current       Subcontractor
            test using an RCD tester carried out by a licenced electrician
            every 3 months.
        5   Fixed RCDs will be tested by a licenced electrician every month     Site Manager /
            by the operation of the pushbutton and undergo an operating         Subcontractor
            time at tripping current test using an RCD tester carried out by
            a licenced electrician every three months from the time of
            installation.
        5   Work on site will be undertaken within the safe approach            Site Manager /
            distances (i.e. exclusion zones) and special provisions will be     Subcontractor
            made including:
             a) to notify and obtain written permission from the power
                  authority before commencing work;
             b) Not to commence work until a pre-start site meeting, a
                  risk assessment detailing the necessary controls to be
                  implemented and training has been completed.
            All isolations of live electrical circuits will involve placing a   Electrical
        3   physical lock and attachment of a Danger tag with relevant          Subcontractor
            details associated with the isolation (including the name of the    Site Manager
            electrician who has undertaken the isolation) to prevent
        5   unauthorised access.


WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                 Page 24

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.