Hutchinson builders Isolation & Lock Out Permit must
be completed prior to commencement of work
5 Full details of the Isolation & Lock out procedure will be Electrical
detailed within the electrical subcontractor’s Safety Plan / Subcontractor
SWMS.
5 Refer Hutchinson Builders procedure SP:03 Isolation & Lock Subcontractor
Out for other isolation details: Site Manager
Hutchinson builders Isolation & Lock Out Permit must
be completed prior to commencement of work
5 All distribution boards MUST be adequately identified in Electrical
sequence from the start of the electrical circuit (e.g. main Subcontractor
power supply) to the end of the electrical circuit on temporary Site Manager
power grid.
Distribution boards are to be marked inside adjacent
the main switch – as to where the circuit supplying
the board originates from.
A plan/register of distribution board sequence is to
be retained in the project site office accompanied
with a number system on each DB board in sequence.
C 4 E18 5 EWPs will not be used as cranes. WH&S Reg C3 Site Manager /
Elevating Contact with overhead
☒ Work obstructions /
5 Persons who are not appropriately licenced will not be 2011Part 4.5
VIC OHS Act H13 Subcontractor
permitted to operate EWPs.
Platform electrical lines 2004
3 Barricades will be erected around the EWP work area as Vic Reg Part 3.5
Use
Persons falling determined by risk assessment. Managing the
4 Out of level audible and / or visual alarms will be fitted to Risks of Plant in
Objects falling the workplace
EWP’s without level limiting switches.
QLD 2013
Rollover of EWP 5 Logbooks are to be maintained and be kept on each EWP and
Managing the
available for inspection. risks of plant in
5 All tasks involving the use of EWP equipment are to have an the workplace
approved SWMS in place which takes into account the hazards NSW 2014
of: contact with overhead obstructions / electrical lines, Managing the
risks of plant in
persons falling, objects falling and rollover of EWP (as the workplace
applicable). TAS & SA 2012
5 No persons will exit from the bucket or platform at height Working Near
unless a risk assessment is carried out and suitable precautions Exposed Live
Parts and
are in place to ensure the safety of persons in the bucket /
Electrical Safety
platform and structure. Act COP 2002
5 Where a EWP is used for access it will be used only for that Managing the
purpose and will not be moved away from the building. risk of falls in
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.