Original PDF page 116, section 1. The text section number identifies this passage in the reader.
combination of these.
5 Trenches 1m deep or more will be inspected at the intervals Subcontractor
identified by a competent person in the SWMS.
5 Where there are any excavations which may reduce the Subcontractor / HSO
stability of a structure, controls will be identified and Site Manager
implemented to prevent a person’s exposure to risk of death,
injury, illness from the collapse of part or all of the structure.
5 Plant operator’s competency to be verified at the site HSO /Site Manager
induction re: statement of attainment by RTO or Employers
statement of competency pursuant of assessment by RTO or
previously held license.
5 Daily inspections of trenches and excavations will be Subcontractor / HSO
undertaken actioned and recorded on the Weekly Inspection Site Manager
Sheet.
5 Mobile plant and materials will be kept back from the edge of Subcontractor / HSO
excavations to prevent them falling into the excavation / Site Manager
causing a cave in / contaminating the atmosphere in the
excavation.
5 A competent person will supervise all excavation work and Subcontractor / HSO
their details are recorded on the SWMS Site Manager
5 All trenches will have a safe means of access and egress (where
access is required).
5 Subcontractor/ HSO
Excavation areas will be signed as required.
Site Manager
5 Where an excavation meets the requirements as a confined Subcontractor/ HSO
space, the confined space requirements of the project risk Site Manager
assessment will apply.
5 Investigations regarding underground services will be Subcontractor/ HSO
undertaken prior to work commencing onsite (e.g. client, dial Site Manager
before you dig, etc.).
5 Details (prescribed information) about underground services Subcontractor/ HSO
will be recorded in writing and given to each person who is to Site Manager
do excavation work.
5 Underground services will be clearly marked according to Subcontractor/ HSO
available plans and onsite checks prior to the commencement Site Manager
of work.
5 Any further information available to Hutchinson Builders Subcontractor/ HSO
about ground conditions and risks such as contamination by Site Manager
hazardous substances etc. will be provided to each person
who is to do excavation work.
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.