Skip to the record
Accept no substitutions.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 117, section 1. The text section number identifies this passage in the reader.

                                                            (Note: Hutchinson Builders Hazardous Substances procedures
                                                            may apply in these cases)
                                                        5   The information about underground services will be kept                                     Subcontractor/ HSO
                                                            onsite until the project ends and a Hutchinson Builders                                     Site Manager
                                                            Excavation Permit will be action prior to the start of any
                                                            excavation works
                                                        5   All tasks involving excavations or trenching to have an                                     Subcontractor/ HSO
                                                            approved SWMS in place which details controls for the                                       Site Manager
                                                            following issues (as applicable):
                                                             - the fall or dislodgment of earth and rock,
                                                             - the instability of the excavation or any adjoining
                                                                 structure,
                                                             - he inrush of water,
                                                             - the placement of excavated material,
                                                             - instability due to persons or plant working adjacent to the
                                                                 excavation,
                                                             - security of the excavation during and outside of work
                                                                 hours,
                                                             - Actions in the case of an unplanned contact with
                                                                 underground services.
                                                             Any further information available to Hutchinson Builders                                   Subcontractor/ HSO
                                                             about ground conditions and risks such as contamination by                                 Site Manager
                                                             hazardous substances etc. will be provided to each person
                                                             who is to do excavation work.
                                                             (Note: Hutchinson Builders Hazardous Substances procedures
                                                             may apply in these cases)


                                        A   3    E20    5   All tasks involving explosive powered tools will have an              WHS Act        C3    Site Manager /
    Explosive      Mechanical energy
☒   Power Tools    Manual handling
                                                            approved SWMS in place which takes into account the
                                                                                                                               
                                                                                                                                   2011 Part 2
                                                                                                                                   Managing       H13   Subcontractor / HSO
                                                            following hazards:
                   Excessive noise                          - mechanical energy
                                                                                                                                   the risks of
                                                                                                                                   plant in the
                    levels                                   - manual handling                                                     workplace
                   Flying particles/                        - excessive noise levels                                              2013 QLD
                    materials.                               - Flying particles / materials.                                      Managing
                                                                                                                                   the risks of
                                                        5   Clearly legible sign(s) will be placed in the vicinity where the       plant in the         Site Manager /
                                                            tool is being used to warn other workers of the work being             workplace            Subcontractor / HSO
                                                            undertaken on site.                                                    2014 NSW
                                                        3                                                                         Plant COP
                                                            The firing place will be protected with barricading for a              VIC 1995
                                                                                                                                                        Site Manager /
                                                            minimum of 6 metres in all directions.                                                      Subcontractor / HSO



                                                WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                      Page 33

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.