“Exit” signs to be positioned at all exit points from
floor levels to exit stairs
“Evacuation Route” signs to be position along areas
where Exit Signs can’t be quickly identified due to
building structure changes
exit signs to be position at a height of 2 metres and at
various locations along the access way to adequately
inform workers of the safe exit route to take
be position at a height minimum of 2 metres above
the floor adjacent to the exit openings
be illuminated adjacent internal stair wells – refer
Electivity Supply
to be maintained on a daily basis and assessed on
Weekly Inspection Checklist
4 Fire Extinguisher Site manager/
Not less than one fire extinguisher to suit Class A, B foreman/ HSO
and C fires and fires involving electrical equipment
will be provided at all times on each storey adjacent
to each required exit or temporary stair or exit –
Fire extinguishers to be installed with mounting
bracket, (approximately 1m above floor level) and
signage (approximately 2m above floor) to prevent
possible dislodgement and damage.
to be maintained on a daily basis and assessed on
Weekly Inspection Checklist
To be tested and tagged every 6 months
4 After the building has reached an effective height of 12m: Site manager/
the required hydrants and hose reels for the building foreman/HSO
will be operational in at least every storey that is
covered by the roof or the floor structure above,
except the 2 uppermost storeys; and
any required booster connections are installed.
Hose reels to be rolled onto drum at all times
be uncluttered and kept clear in front of hose reels
water to be charge in reels at all times
to be maintained on a daily basis and assessed on
Weekly Inspection Checklist
5 Site manager/
Fire evacuation procedures including an evacuation path
foreman/ HSO
diagram will be developed and included in the WHSMP.
Workers
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.