                    Repetitive lifting                  4/   Wherever practicable, all objects will be designed,                  2011 QLD,
                                                                                                                                                 Hutchinson Builders/
                                                                                                                                   NSW & SA
                                                         5    constructed and purchased to enable safe manual handling.                          Subcontractor
                                                                                                                                  Manual
                                                          5   Subcontractors to provide SWMS for high risk manual tasks on         Handling
                                                                                                                                   2000 VIC
                                                                                                                                                 Subcontractor / HSO
                                                              site. The SWMS is to address (as applicable):
                                                                                                                                  Manual
                                                               - manually handling excessive loads                                 Tasks 2010
                                                               - adopting poor postures when undertaking manual                    WA
                                                                    handling tasks                                                Hazardous
                                                               - repetitive lifting                                                Manual
                                                                                                                                   Tasks 2012
                                                          2   Mechanical equipment will be used for manual handling tasks                        Subcontractor / HSO
                                                                                                                                   TAS & NT
                                                              wherever practicable on site.
                                                          5   Material delivery will be organised to enable unloading onsite                     Subcontractor / HSO
                                                              and to minimise manual handling.
                                                          5   Persons using mechanical equipment provided will be trained                        Subcontractor / HSO
                                                              in the safe use of that equipment and records kept.


                                          B   4    E21    5   Hoist contractor/supplier to provide safety plan and Safe Work      WHS Act       Site manager /
    Man/            Hoist Collapse
☐   Material        Hoist electrical                         Methods on the safe set up, erection, servicing and
                                                                                                                               
                                                                                                                                   2011
                                                                                                                                   WHS Reg
                                                                                                                                                 foreman /
    Hoist            failure                                  dismantling of the hoist                                             2011 Parts    subcontractor
                                                                                                                                   5,6
                    Falling objects                      5   A commissioning report must be provided to the site                                Site manager /
                                                              manager/foreman by a competent person certifying that the           VIC OHS Reg
                                                                                                                                                 foreman / Operator
                                                                                                                                   2007 Part
                                                              hoist is safe for common use before the hoist may be used            3.5, sch 3.   / Subcontractor
                                                              onsite.                                                             AS 1418.1-
                                                          5                                                                        2002 Cranes   Site manager /
                                                              Any operators must hold the appropriate licence and be               hoists and    foreman / Operator
                                                                                                                                   winches
                                                              competent to operate the height and type of hoist installed.         general
                                                                                                                                                 /
                                                                                                                                   requirement   Subcontractor
                                                          5   Evidence of the operator’s licence will be provided to               s
                                                                                                                                                 Operator / HSO at
                                                              Hutchinson Builders, and copies made and retained on site                          Induction
                                                              (where copy facilities are available).
                                                          5   All services and repairs carried out on the hoist are to be                        Site Manager /
                                                              carried out by competent persons and all records recorded in                       foreman / Operator
                                                              the hoist log book.                                                                / competent person




                                          B   5    E24    5   A review of the profile of the building will be carried out to      WH&S Act      Site manager /
☐   Mast Climber    Mast collapse
                                                              ensure the safe installation and operation of the mast climber
                                                                                                                                   2011 Part 2   foreman /
                                                              when attached to the building                                                      supplier


                                                  WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                  Page 48

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.