Mast Climber The electrical power supply required to safely operate the WH&S Reg Site manager /
electrical failure 2011
mast climber is to be reviewed, provided and installed by a Chapter 5,6
supplier / licensed
licensed electrician electrician
Falling Objects Vic OHS Reg
5 Part 3.5 and Site manager /
Mast Climber contractor/supplier to provide a Safety Plan and
5.1
Safe Work Methods on the safe set up, erection, servicing and foreman /
dismantling of the Mast Climber contractor
5 Mast Climber supplier to provide an engineer’s drawing to Site manager /
verify the layout of the platform to be used, spacing, fixing foreman /
method and type of mast ties to be used in the securing of the Supplier/engineer
mast climber to the structure
5 A commissioning report must be provided to the site Site manager /
manager/foreman by a competent person certifying that the foreman / installer /
mast climber has been installed as per the engineer’s drawings Subcontractor/
and is safe for common use before the mast climber may be supplier
used onsite.
5 Operators of the mast climber must be trained in the safe Site manager /
operation of the mast climber by a competent person foreman / installer /
provided by the supplier of the mast climber – provide Subcontractor/
records to the site manager/foreman supplier
5 All pre-start checklist and safe operational checks must to be Operator /Foreman/
carried out by the trained operator at the start of each day – HSO at Induction
records to be kept on site
5 Site Manager /
All services and repairs carried out on the mast climber is to
foreman /
be carried out by a competent persons and all records
competent
recorded in the mast climber log book
person/supplier
5 Subcontractors using the mast climber are to provide a safe Site manager /
work method statement in the safe operation and work subcontractor
activities to prevent falling objects when performing work on
the mast climber.
C 4 E18 5/ As general access to the site (or specific site area) presents a WH&S Reg D3 Site Manager / HSO
☒ Noise Exposure to
excessive noise
6 significant noise exposure hazard, signage will be erected to 2011 Part
4.1 M9
identify this issue and require mandatory personal protective
Exposure to low Managing
equipment (ear protection) to be worn. noise and
level noise
5 Noise will be kept to a minimum on site. preventing All personnel
hearing loss
5 Safe Work Method Statements will include details of specific at work 2011 Subcontractor / HSO
activities that create excessive noise levels, and noise control QLD, NSW &
methods to be implemented while working on site. SA
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.