5 Where personal protective equipment is identified as a VIC OHS Reg Subcontractor / HSO
control, specific details and instructions concerning its correct 2007 Part
3.2, 2.1
use, fitting, care, maintenance and placement will be given.
Managing
5 Site noise assessments will be undertaken where it is Noise and Site Manager / HSO
considered that persons are exposed to noise exceeding the Preventing
maximum levels detailed in the relevant legislation. Hearing Loss
at Work
2012 TAS &
NT
C 4 E18 4 All penetrations will be provided with a fall protection cover WH&S Reg D3 Subcontractor / Site
Penetrations Falls from heights
☒ that is: 2011
Chapter 6 M9 Manager
Falling objects - able with withstand the impact and safety support of a
Managing
fall onto it by any person, machinery or materials; the Risk of
- installed so that it does not create a trip hazard; Falls at the
- be securely fixed in place to prevent it being moved or Workplace
removed accidentally; and COP 2011
QLD, NSW &
- Marked with the words “Danger Hole Under” and SA
painted in a bright colour. Safe work on
4 Penetrations that are impracticable to cover will have full edge roofs 2009 Subcontractor / Site
protection. Edge Protection shall be installed by a competent NSW
Manager
person and be handed over to Hutchinson Site Management. VIC
Compliance
4 Where practicable at the time of forming up a stable cast in code Subcontractor / Site
metal mesh capable of withstanding the potential imposed Prevention Manager
loads will be used for penetrations with small diameters to be of falls in
general
formed in slab. Ply covers used on their own are not preferred
construction
however they can be used as back up to cast in mesh. Prevention
4 All lift shafts and stairwells not to be used for access, will have of falls at Subcontractor / Site
edge protection and be barricaded and signed to prevent any workplaces
Manager
unauthorised entry. 2004 WA
Managing
4 Handrails will be erected to all stairwells and void areas as the risks of Subcontractor / Site
soon as possible. falls at Manager
workplaces
4 Prior to stripping formwork all penetrations formed by the 2012 NT & Subcontractor / Site
stripping will be covered and or protected. TAS. Manager
5 As part of site inspections, penetrations will be checked to Site Manager /
ensure that they are correctly covered. Forman / HSO
3 All lift shafts will have purpose designed construction access Site Manager
cages and lockable doors to restrict access.
4 Penetrations 100mm and over are to be adequately covered Site Manager/
to prevent trips and spills hazards and to ensure that objects Foreman/HSO
do not fall to the level below.
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 50
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.