Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 135, section 1. The text section number identifies this passage in the reader.

                                            D   3    M9     5   Violence (and threats of violence), harassment or bullying will        WH&S Act       D2    All personnel
    Physical and    Exposure to
☒   Mental           violence
                                                                not be tolerated on this site.
                                                                                                                                    
                                                                                                                                        2011 Part 2
                                                                                                                                        VIC OHS Act    L5
                                                            5   Reports of violence (and threats of violence), harassment or                                 Site Management
    Wellbeing                                                                                                                           2004 Part 3,
                    Exposure to                                bullying will be taken seriously and the Hutchinson Builder’s           4
    Hazards
                     harassment /                               Non-conformance procedures will apply in these situations.             Fatigue
                     bullying                               5   Violence (and threats of violence) may be reported to the state         Managemen
                                                                                                                                                             Site Management
                                                                police. (As required)                                                   t Guide -
                    Working under the                                                                                                  QLD
                                                            5   Drug and alcohol use will not be permitted onsite.                                          All personnel
                     influence of drugs /                                                                                               Fatigue –
                     alcohol                                                                                                            Prevention
                                                            5   Site rules regarding drugs and alcohol, harassment, violence                                 HSO at site induction
                                                                                                                                        in the
                                                                and bullying will be communicated to all persons during the
                    Extended working                                                                                                   Workplace –
                                                                site induction.                                                         NSW
                     hours or reduced
                                                            5                                                                                                Site manager or
                     rest period                                Persons will not be permitted on site if they are under the
                     between work                                                                                                                            Foreman / All
                                                                influence of alcohol or drugs.
                     shifts                                                                                                                                  personnel
                                                            1
                    Exposure to                                Night work – if required, will be managed so that required                                   Site manager or
                     workplace stress                           breaks are taken.                                                                            Foreman
                                                            5   Working hours onsite will be in accordance with the local                                    Site manager or
                                                                council building requirements                                                                Foreman


                                            B   5    E24    5   All tasks involving the use of plant or equipment to have an           WH&S Act       E5    Site Manager / HSO
    Plant and       Manual handling
☒   Equipment
                                                                approved SWMS in place which addresses at least the
                                                                                                                                    
                                                                                                                                        2011 Part 2
                                                                                                                                        WH&S Reg       H15   / Subcontractor
                    Exposed moving                             following hazards (as applicable):
                                                                                                                                        2011
                     parts                                       - manual handling                                                      Chapter 5,6
                                                                                              - unstable plant
                                                                 - exposed         moving                                              VIC OHS Act
                    Excessive noise /                                                        - inadequate lighting
                                                                      parts                                                             2004 Part 3
                     vibration                                                                - slips and trips                        VIC OHS Reg
                                                                 - excessive noise
                                                                                              - falling objects                         2007 Part
                    Unstable ground                             - vibration
                                                                                                                                        3.5
                                                                 - emissions                                                        
                    Incompetent                            5   All plant requiring registration to the relevant state authority
                                                                                                                                        Managing
                     operators
                                                                                                                                        the Risk of          Site Manager / HSO
                                                                will be so registered and evidence of registration provided to          Plant in the         / Subcontractor
                                                                                                                                        Workplace
                    Emissions                                  Hutchinson Builders upon request.
                                                                                                                                        2013 QLD
                                                            1   Any machinery brought onto site without adequate guarding                                    Site Manager / HSO
                    Cluttered storage                                                                                                 Managing
                                                                        will be:                                                        the risks of         / Subcontractor
                     areas                                            removed immediately; or                                          plant in the
                    Unsafe plant use on                              Isolated and clearly tagged/signed “Out of Service” or           workplace
                                                                                                                                        2014 NSW
                     site                                                 unsafe for use until appropriate guarding is installed,
                                                                                                                                       Plant 1995
                                                                          or the item is removed from site.                             VIC
                    Struck by plant                        4   Where there is a potential for mobile plant to contact                 Safe                 Site Manager / HSO
                     movements                                                                                                          guarding of
                                                                scaffolding, formwork, tilt-up panel bracing or similar load                                 / Subcontractor
                                                    WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                               Page 51

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.