access to plant bearing structures, appropriate barricading will be machinery
and plant
outside of the hours installed/erected to prevent vehicle access to the immediate
2009 WA
of work open area, or protect the structure from such collisions. Managing
penetrations 5 Subcontractors will provide adequate supervision to ensure the risks of
plant and equipment is used in accordance with plant in the
manufacturer's instructions. workplace
2012 SA &
5 Subcontractors will ensure all persons involved in the TAS Site Manager / HSO
commissioning, installation, use, operation; maintenance, / Subcontractor
repair and testing, and the de-commissioning, dismantling and
disposal, of plant are provided with all available information
concerning health and safety about the item of plant.
5 Any remotely / automatically operated machinery will be Site Manager / HSO
appropriately signed and barricaded to ensure persons are not / Subcontractor
put at risk.
5 Persons will not travel / be lifted / moved by any item of Site Manager / HSO
mobile plant unless it has been specifically designed for that / Subcontractor
purpose.
5 Site Manager / HSO
Plant which lifts or moves loads will be marked with its SWL.
/ Subcontractor
5 Personnel involved with the operation of mobile plant on site Subcontractor / HSO
and those personnel in the vicinity of mobile plant operations
on site will wear high visibility vests or clothing.
5 All subcontractors will provide a register for all equipment to Subcontractor / HSO
be used on site. This register must show the date of the last
service for each item and when the next service is due for each
item.
5 Underground services, overhead power lines, unstable HSO / Site Manager
ground, and other excavations in the vicinity will be identified
and details given to the subcontractor.
5 A plant and equipment register will be maintained on site for HSO / Site Manager
all plant used by Hutchinson Builders personnel and common
plant provided for general use on site. This register will detail
records of any tests, maintenance, inspections,
commissioning or alteration of the plant.
5 Hutchinson Builders will ensure common plant is safe and HSO / Site Manager
effectively maintained throughout the course of the project.
5 Contractors will be required to provide evidence of Subcontractor /
‘competencies’ for operating plant or equipment upon Team Member
request. For all jobs requiring licences / tickets, the relevant Conduction
certificate of competency must be sighted and copied by Induction
Hutchinson Builders before persons undertake that work.
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.