Traffic and 5 Where the drivers of vehicles, trucks and plant turn up Site Manager
pedestrian control unannounced to site and are required to reverse into the site
across public footpaths an walkways the following is to be
Slips, trips and falls
implemented;
☐Erect a sign at the entry gates “Directing drivers to contact
the site manager/foreman before entering site – provide
phone numbers.
4 ☐Email suppliers and subcontractors to advise them of the
health and safety protocol to be followed for plant &
vehicle movements onto the site.
☐Where there are members of the public using the footpath
or walkways provide a spotter or mechanical aids to
control their movements during the reversing process.
☐The reversing vehicle, plant and trucks from the street to be
controlled as per the traffic management plan for the
project
1. 1 For QLD: Around the perimeter of the site based on the angle Site Manager
made between a) the horizontal and b) an imaginary line
drawn between the closest point where the public have
access, to the highest point on the building/structure where
work is to be done:
2. The fencing will be:
(< 15 o) ☐ barricade or hoarding at least 900mm high
(15o – 30o) ☐ A hoarding at least 1800mm high.
o
(30 – 75 )o
☐ a hoarding at least 1800mm high that is fully
sheeted with timber, plywood, metal or
sturdy synthetic sheets
(75o or more) ☐ a hoarding at least 1800mm high that is fully
sheeted with timber, plywood, metal or
sturdy synthetic sheets, AND one of the
following;
a gantry (or overhead protective
structure), (incorporating the hoarding),
or
the adjoining area is closed to prevent
objects falling on or otherwise hitting
members of the public in that area; or
A catch platform with vertical sheeting
or perimeter containment sheeting is
installed.
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.