Exposure to welding - exposure to welding product fumes and atmospheres WH&S Reg
product fumes and - mechanical and electrical hazards 2011
Chapter 6
atmospheres - UV radiation exposure
VIC OHS Act
Mechanical hazards - fire and explosion 2004 Part 3
Electrical hazards 5 Due to risk of fire or property damage a Hot Work Permit will VIC OHS Reg Subcontractor / Site
Ultraviolet radiation be required prior to any hot work on site. (Refer to checklist) 2007 Part Manager
5.1
exposure 4
Fire and Explosion Flash back arresters will be fitted to all oxy-acetylene Subcontractor / Site
equipment. Manager
5 Fires watch person will be used at any time where hot works Subcontractor / Site
are carried out. Manager
5 A suitable fire extinguisher will be provided in close proximity Subcontractor / Site
where welding/hot work processes are carried out on site. Manager
5 Signs will be erected to indicate welding areas and associated Subcontractor / Site
hazards. Manager
3 Where UV radiation is produced from welding activities Subcontractor / Site
screens will be used to isolate welding activities and workers Manager
who are not carrying out the welding will not be permitted in
the welding area.
4 Subcontractor / Site
Additional ventilation will be provided where required.
Manager
5 Controls will be implemented to prevent hot slag, molten Subcontractor / Site
metal or sparks falling between levels of the construction. Manager
4 Catch mats or boards will be positioned so as to prevent hot Subcontractor / Site
slag, molten metal or sparks falling between levels of the Manager
construction.
1 All materials that may be combustible or flammable (including Subcontractor / Site
chemicals) will be removed from the hot work area before Manager
work commences.
5 Gas cylinders onsite will: Subcontractor / Site
be stored vertically Manager
be adequately restrained and secured against movement
have full cylinders are segregated from empty cylinders
have fuel gases are segregated from oxygen (e.g.
acetylene and oxygen)
have signage, such as “No Smoking or Naked Lights” is
displayed where fuel gases are stored
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 68
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.