Original PDF page 152, section 1. The text section number identifies this passage in the reader.

 Exposure to welding                     -    exposure to welding product fumes and atmospheres            WH&S Reg
  product fumes and                       -    mechanical and electrical hazards                             2011
                                                                                                             Chapter 6
  atmospheres                             -    UV radiation exposure
                                                                                                            VIC OHS Act
 Mechanical hazards                      -    fire and explosion                                            2004 Part 3
 Electrical hazards              5   Due to risk of fire or property damage a Hot Work Permit will         VIC OHS Reg   Subcontractor / Site
 Ultraviolet radiation               be required prior to any hot work on site. (Refer to checklist)        2007 Part     Manager
                                                                                                             5.1
  exposure                        4
 Fire and Explosion                  Flash back arresters will be fitted to all oxy-acetylene                             Subcontractor / Site
                                      equipment.                                                                           Manager
                                  5   Fires watch person will be used at any time where hot works                          Subcontractor / Site
                                      are carried out.                                                                     Manager
                                  5   A suitable fire extinguisher will be provided in close proximity                     Subcontractor / Site
                                      where welding/hot work processes are carried out on site.                            Manager
                                  5   Signs will be erected to indicate welding areas and associated                       Subcontractor / Site
                                      hazards.                                                                             Manager
                                  3   Where UV radiation is produced from welding activities                               Subcontractor / Site
                                      screens will be used to isolate welding activities and workers                       Manager
                                      who are not carrying out the welding will not be permitted in
                                      the welding area.
                                  4                                                                                        Subcontractor / Site
                                       Additional ventilation will be provided where required.
                                                                                                                           Manager
                                  5   Controls will be implemented to prevent hot slag, molten                             Subcontractor / Site
                                      metal or sparks falling between levels of the construction.                          Manager
                                  4   Catch mats or boards will be positioned so as to prevent hot                         Subcontractor / Site
                                      slag, molten metal or sparks falling between levels of the                           Manager
                                      construction.
                                  1   All materials that may be combustible or flammable (including                        Subcontractor / Site
                                      chemicals) will be removed from the hot work area before                             Manager
                                      work commences.
                                  5   Gas cylinders onsite will:                                                           Subcontractor / Site
                                       be stored vertically                                                               Manager
                                       be adequately restrained and secured against movement
                                       have full cylinders are segregated from empty cylinders
                                       have fuel gases are segregated from oxygen (e.g.
                                          acetylene and oxygen)
                                       have signage, such as “No Smoking or Naked Lights” is
                                          displayed where fuel gases are stored
                                      

                          WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                           Page 68

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.